I applied via Approached by Company and was interviewed in Aug 2022. There were 5 interview rounds.
The wastage percentages of construction materials vary depending on the type of material and the project requirements.
Wastage percentages can range from 2-5% for cement and steel to 10-15% for bricks and tiles.
Factors that affect wastage include the skill level of workers, the quality of materials, and the complexity of the project.
Proper planning and management can help minimize wastage and reduce project costs.
Regula...
Rolling margin of steel is the difference between the cost of producing steel and the selling price.
It is a measure of profitability for steel manufacturers.
It is calculated by subtracting the cost of production from the selling price.
A higher rolling margin indicates higher profitability.
Factors that affect rolling margin include raw material costs, energy costs, and market demand.
Worker and machinery productivity are crucial for effective planning.
Worker productivity can be measured by the amount of work completed in a given time period.
Machinery productivity can be measured by the amount of output produced by the machinery in a given time period.
Both worker and machinery productivity should be taken into account when planning to ensure efficient use of resources.
For example, if workers are mor...
Deductions in client bill include taxes, discounts, late fees, and service charges.
Taxes: Sales tax, VAT, GST, etc.
Discounts: Promotions, loyalty rewards, bulk discounts, etc.
Late fees: Charges for overdue payments.
Service charges: Fees for additional services provided.
Retention and TDS are important factors to consider in subcontractor billing.
Retention refers to the amount of money withheld by the client as a form of security against any defects or issues that may arise after the project is completed.
TDS (Tax Deducted at Source) is the tax deducted by the client from the subcontractor's payment and deposited with the government.
Both retention and TDS should be clearly mentioned in ...
Top trending discussions
posted on 8 Dec 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
Yes, I can prepare BBS (Bar Bending Schedule).
I have experience in preparing BBS for various projects.
I am proficient in using software like AutoCAD and Excel for BBS preparation.
I ensure that the BBS is accurate and meets the project requirements.
I also coordinate with the site team to ensure timely delivery of BBS.
Yes, I am familiar with Rate Analysis. A rate analysis for blockwork involves calculating the cost of materials, labor, and equipment needed for the project.
Determine the quantity of materials needed for the blockwork
Calculate the cost of materials per unit
Estimate the labor cost based on the time required for the project
Include equipment costs such as scaffolding and tools
Add all costs together to determine the total ...
Yes, I am familiar with item rate billing.
Item rate billing is a method of billing where each item or service is charged separately.
It is commonly used in construction and engineering projects.
The rates for each item are pre-determined and agreed upon by both parties.
This type of billing allows for greater transparency and accuracy in billing.
It also allows for easier tracking of expenses and budgeting.
Basic rate variation refers to the change in the standard rate of a particular item or service.
It is a change in the standard rate of a particular item or service
It can be due to various factors such as inflation, market demand, etc.
For example, if the basic rate of a product is $10 and it increases to $12, it is a basic rate variation.
Basic rate variation is due to changes in the scope of work, while rate escalation is due to inflation or market changes.
Basic rate variation occurs due to changes in the scope of work, such as additional work or changes in the design.
Rate escalation occurs due to inflation or market changes, such as an increase in the cost of materials or labor.
Basic rate variation is typically negotiated and agreed upon before the st...
posted on 3 Mar 2024
Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.
Calculate the surface area of the structure that needs formwork
Determine the type of formwork material to be used
Consider the complexity of the structure and any special requirements
Account for wastage and extra material for safety
Use standard formulas or software for accurate calculations
posted on 28 Nov 2023
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I have completed 5 years of billing and execution work in the civil engineering field.
I have 5 years of experience in handling billing and execution work in civil engineering projects.
During these years, I have successfully managed the billing process and ensured accurate and timely invoicing.
I have also coordinated with project teams and contractors to track progress and ensure proper execution of work.
In addition, I ...
My expectation of CTC is based on my experience, skills, and market standards.
Consider my experience and skills in the field
Research market standards for Billing Engineer Civil
Take into account the company's budget and compensation structure
Negotiate based on the value I can bring to the organization
Be open to discussing other benefits and perks
posted on 22 Nov 2023
I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 21 Mar 2024
I was interviewed before Mar 2023.
IS Code 1200 Part 1 is used for quantity survey for earth work.
IS Code 1200 Part 1 provides guidelines for measurement and billing of earthwork in civil engineering projects.
It includes methods for calculating quantities of excavation, backfilling, and earthwork in embankments.
The code also covers specifications for the preparation of bills of quantities for earthwork.
Engineers and contractors refer to IS Code 1200 Par...
posted on 23 Nov 2022
Problems you've faced during construction
posted on 11 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Client bills are submitted by verifying the services provided and charges incurred, generating an invoice, and sending it to the client.
Verify services provided and charges incurred
Generate invoice
Send invoice to client
Variations & extra items refer to additional charges or changes made to a standard billing item.
Variations can include changes in pricing due to location, time of day, or other factors.
Extra items can include additional services or products added to a standard billing item.
These charges are typically added on top of the standard billing item and can increase the overall cost.
Examples include a hotel charging extra for ...
posted on 1 Sep 2017
I was interviewed in Mar 2017.
Working hours of an equipment can be calculated by subtracting the start time from the end time.
Obtain the start time and end time of the equipment's operation.
Convert the start and end times to a common time format, such as hours and minutes.
Subtract the start time from the end time to calculate the duration of operation.
Consider any breaks or downtime during the operation and subtract them from the total duration.
The...
Depreciation is the decrease in the value of an asset over time due to wear and tear, obsolescence, or other factors.
Depreciation is a method used in accounting to allocate the cost of an asset over its useful life.
It represents the reduction in the value of an asset on the balance sheet.
Depreciation can be calculated using various methods such as straight-line, declining balance, or units of production.
Example: A comp...
The per hour cost of operating a batching plant depends on various factors such as the size of the plant, the type of materials being processed, and the labor and maintenance costs.
The size of the batching plant affects the operating cost. Larger plants generally have higher operating costs due to increased energy consumption and maintenance requirements.
The type of materials being processed also impacts the cost. Diff...
posted on 14 Feb 2023
I applied via Naukri.com and was interviewed before Feb 2022. There was 1 interview round.
Yes, I can prepare bar bending schedule.
I have experience in preparing bar bending schedules for various projects.
I am proficient in using software such as AutoCAD and Excel to prepare the schedules.
I ensure that the schedules are accurate and comply with the project specifications.
I also coordinate with the project team to ensure that the schedules are delivered on time.
The mix proportion of M30 is 1:1:2 (cement:sand:aggregate) by weight.
M30 is a grade of concrete used in construction.
The mix proportion of M30 is determined by weight.
The mix proportion of M30 is 1:1:2 (cement:sand:aggregate) by weight.
This means that for every 1 part cement, 1 part sand and 2 parts aggregate are used.
Civil Site Engineer
16
salaries
| ₹2.9 L/yr - ₹5.8 L/yr |
Civil Engineer
13
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Senior Engineer
7
salaries
| ₹6 L/yr - ₹11.4 L/yr |
Site Engineer
7
salaries
| ₹2 L/yr - ₹7 L/yr |
Senior Legal Officer
6
salaries
| ₹9 L/yr - ₹18 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group