I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.
PT slab refers to a post-tensioned slab, which is a type of reinforced concrete slab that uses high-strength steel tendons to provide additional strength and reduce cracking.
PT slab is a structural system commonly used in buildings and bridges.
It involves the use of steel tendons that are tensioned after the concrete has hardened.
The tendons are typically placed in a grid pattern and anchored at the ends of the slab.
Th...
Steel density is the measure of how much mass is contained in a given volume of steel.
Steel density is typically measured in kilograms per cubic meter (kg/m³).
The density of steel can vary depending on its composition and specific type.
For example, the density of carbon steel is around 7850 kg/m³.
Stainless steel, on the other hand, has a density of about 8000 kg/m³.
Density is an important property to consider in struct
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
Interview experience
Resident Engineer
21
salaries
| ₹10.2 L/yr - ₹19.2 L/yr |
Senior Safety Engineer
14
salaries
| ₹8.8 L/yr - ₹12 L/yr |
Structural Design Engineer
11
salaries
| ₹6.5 L/yr - ₹15.5 L/yr |
Supervision Engineer
11
salaries
| ₹6 L/yr - ₹12 L/yr |
Senior Engineer
7
salaries
| ₹6 L/yr - ₹8.4 L/yr |
AECOM
Jacobs Engineering Group
WSP
Fluor Corporation