Upload Button Icon Add office photos

Tractebel

Compare button icon Compare button icon Compare

Filter interviews by

Tractebel Project Manager Construction Interview Questions and Answers

Updated 31 Jan 2023

Tractebel Project Manager Construction Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Formal quotation like your job role
Round 2 - Technical 

(1 Question)

  • Q1. About project and project regarding questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Cool and enjoy HR and technical round technical rounds basis on your knowledge

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

4 Questions

  • Q1. Instrumentation Basics
  • Q2.  DCS Architecture for various Projects handled in my career
  • Ans. 

    I have worked on various DCS architectures in my career, including those for chemical plants and power plants.

    • Designed and implemented DCS architecture for a chemical plant project

    • Developed DCS architecture for a power plant project

    • Worked on DCS architecture for a water treatment plant project

    • Collaborated with team to create DCS architecture for a pharmaceutical plant project

  • Answered by AI
  • Q3. Boiler Process and Logic Configurations
  • Q4. Package Negotiation

Interview Preparation Tips

Round: Resume Shortlist
Experience: DCS and Industrial Automation

I applied via Employment News and was interviewed before Mar 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. How do you rate BHEL based on your assessment &/or friends feedback.
  • Ans. 

    BHEL is a reputable company with a strong track record in the industry.

    • BHEL has a long history of delivering high-quality products and services.

    • The company has a strong market presence and is well-known for its engineering expertise.

    • BHEL has received positive feedback from my friends who have worked or interacted with the company.

    • The company's financial performance and growth prospects are promising.

  • Answered by AI
  • Q2. What if you are given posting near to your hometown

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. Interviewer wants to judge as to how much you know and is not interested in knowing how much you do not know.
Have eye contact with interview members.
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed before Mar 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Question raised by resume
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and negotiated by hr
Round 4 - Medical 

(1 Question)

  • Q1. Physical medical test

Interview Preparation Tips

Interview preparation tips for other job seekers - Good selection process and found satisfy …….always do on time and take quick decision .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

What is the Substation ,
Why need cable trench,
How much room in substation

Round 3 - One-on-one 

(4 Questions)

  • Q1. Substation in civil work
  • Ans. 

    Substation in civil work involves the construction of buildings and structures to house electrical equipment for power distribution.

    • Substation civil work includes site preparation, foundation construction, building erection, and equipment installation.

    • Design considerations include safety, accessibility, and structural integrity.

    • Examples of substation civil work include transformer foundations, control buildings, and sw

  • Answered by AI
  • Q2. What is the control room ??
  • Ans. 

    The control room is a centralized location where monitoring, control, and coordination of various systems and processes take place.

    • Centralized location for monitoring and controlling systems

    • Used in industries like power plants, manufacturing plants, and transportation systems

    • Equipped with control panels, computers, communication systems, and monitoring devices

    • Allows operators to make real-time decisions and adjustments

    • ...

  • Answered by AI
  • Q3. What for battery room
  • Ans. 

    Battery rooms are designated areas where batteries are stored, charged, and maintained.

    • Battery rooms are used to store batteries for backup power systems.

    • They are equipped with charging stations and ventilation systems to ensure safety.

    • Regular maintenance and inspections are conducted in battery rooms to ensure optimal performance.

    • Battery rooms are common in industries such as telecommunications, data centers, and manu

  • Answered by AI
  • Q4. Why need cable trench
  • Ans. 

    Cable trenches are needed to protect and organize cables, prevent damage, and allow for easy maintenance and repairs.

    • Protects cables from physical damage and environmental factors

    • Organizes cables for easy identification and maintenance

    • Facilitates easy access for repairs and upgrades

    • Helps in preventing tripping hazards

    • Ensures compliance with safety regulations and standards

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - building, SP, SSP, ATS in Indian railways WDFCC
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What make s you in difficult situations
Round 3 - HR 

(1 Question)

  • Q1. Current salary and Expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical round
Round 3 - HR 

(1 Question)

  • Q1. Salary previous rg.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is curing,why it is done
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions in concrete for a specific period to ensure proper hydration and strength development.

    • Curing helps in preventing moisture loss from the concrete, which is essential for proper hydration.

    • It helps in maintaining the desired temperature for the chemical reactions to occur.

    • Curing enhances the strength, durability, and overall performance of the concre...

  • Answered by AI

Tractebel Interview FAQs

How many rounds are there in Tractebel Project Manager Construction interview?
Tractebel interview process usually has 3 rounds. The most common rounds in the Tractebel interview process are Resume Shortlist, HR and Technical.

Tell us how to improve this page.

Tractebel Project Manager Construction Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 431 Interviews
Thermax Limited Interview Questions
4.1
 • 249 Interviews
ABB Interview Questions
4.1
 • 232 Interviews
Adani Power Interview Questions
3.9
 • 216 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all
Tractebel Project Manager Construction Salary
based on 5 salaries
₹7.2 L/yr - ₹25 L/yr
6% less than the average Project Manager Construction Salary in India
View more details

Tractebel Project Manager Construction Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

5.0

Salary

4.0

Job security

5.0

Company culture

3.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Management Consultant
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
51 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Tractebel with

Tata Power

3.9
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview