Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Toyo Engineering Team. If you also belong to the team, you can get access from here

Toyo Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Toyo Engineering Piping Designer Interview Questions and Answers

Updated 28 Dec 2023

Toyo Engineering Piping Designer Interview Experiences

1 interview found

Piping Designer Interview Questions & Answers

user image Dasari Chaitanya

posted on 23 Apr 2021

I applied via Referral and was interviewed in Dec 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Package discussion
  • Q2. Related to resume and oil and gas
  • Q3. Pump related Drum related Exchanger related
  • Q4. Related to tool mentioned in resume
  • Q5. Pump suction and discharge Drum modelling

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Heat exchanger pipping
  • Q2. Rack piping
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. How to place a pump with respect to Rack?
  • Ans. 

    The pump should be placed in a location that allows for easy maintenance and operation, while also considering the space and weight limitations of the rack.

    • Consider the flow direction and orientation of the pump

    • Ensure there is enough space for maintenance and repair

    • Take into account the weight of the pump and its impact on the rack

    • Consider the location of other equipment and piping in the area

  • Answered by AI
  • Q2. What is todo list in SP3D, Which type of error may be there,how to encounter them.
  • Ans. 

    Todo list in SP3D is a list of tasks to be completed. Errors may include missing information or incorrect data.

    • Todo list in SP3D is a list of tasks that need to be completed in the software.

    • Errors in the todo list may include missing information or incorrect data.

    • To encounter these errors, the user should carefully review the todo list and ensure that all necessary information is provided.

    • For example, if a piping desig...

  • Answered by AI
  • Q3. You may have to design a test model in SP3D,E3D.
  • Q4. What is the General arrangements be there of equipments.
Round 3 - HR 

(1 Question)

  • Q1. What is your view of society.
  • Ans. 

    Society is a complex web of individuals with diverse backgrounds, beliefs, and values.

    • Society is constantly evolving and changing.

    • It is important to recognize and respect the differences among individuals.

    • Social issues such as inequality, discrimination, and poverty need to be addressed.

    • Community involvement and support are crucial for a healthy society.

    • Education and awareness can help promote positive change.

    • Technolog...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Read Roger Hunt's Process & plant layout design book Throughlly. You will definitely crack it.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Unit plot plan development
  • Q2. Leadership management
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is pressure temperature rating
  • Ans. 

    Pressure temperature rating refers to the maximum allowable pressure and temperature for a piping system or component.

    • Pressure temperature rating determines the safe operating limits of a piping system.

    • It is typically specified by industry standards such as ASME B31.3.

    • The rating is expressed as a combination of pressure and temperature, such as Class 150, Class 300, etc.

    • Higher pressure and temperature ratings indicate ...

  • Answered by AI
  • Q2. What is support
  • Ans. 

    Support refers to the structural elements that hold or carry the weight of a piping system.

    • Supports are used to prevent excessive movement, vibration, or stress on the piping system.

    • They can be in the form of hangers, clamps, brackets, or anchors.

    • Supports are designed based on the weight, size, and material of the piping system.

    • They are typically made of steel or other strong materials.

    • Examples of supports include pipe

  • Answered by AI

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How to work in oil and gas refinery
  • Ans. 

    To work in oil and gas refinery, one must have a strong understanding of piping systems, safety regulations, and industry standards.

    • Obtain a degree in engineering or a related field

    • Gain experience through internships or entry-level positions

    • Familiarize yourself with industry-specific software and tools

    • Stay updated on safety regulations and best practices

    • Develop strong communication and problem-solving skills

  • Answered by AI
  • Q2. How to work in oil and gas refinery erection plan
  • Ans. 

    To work in oil and gas refinery erection plan, one must have knowledge of piping design, construction codes, safety regulations, and project management.

    • Understand piping design principles and specifications

    • Ensure compliance with construction codes and standards

    • Adhere to safety regulations and protocols

    • Coordinate with various teams for project management

    • Review and interpret engineering drawings and documents

  • Answered by AI
  • Q3. Erection and fanfiction plan
  • Q4. Achievement my working Tim
  • Q5. How many types of carane
  • Ans. 

    There are two main types of cranes: mobile cranes and tower cranes.

    • Mobile cranes are versatile and can be easily moved from one location to another. They are commonly used for construction projects.

    • Tower cranes are fixed to the ground and are often used for tall buildings or structures that require heavy lifting at great heights.

  • Answered by AI
  • Q6. Material code ASME section code,pwht
Round 3 - HR 

(1 Question)

  • Q1. Working related

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Piping Engineer interview:
  • Erection
  • Fabrication
Interview preparation tips for other job seekers - Very bad due to after interview selection not given offer letter parcial only join this company or any reference person join this company other persons not tec job this company
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Expansion stress formula
  • Ans. 

    Expansion stress formula calculates the stress caused by thermal expansion or contraction.

    • Expansion stress formula is given by: ΔL/L = αΔT, where ΔL is the change in length, L is the original length, α is the coefficient of thermal expansion, and ΔT is the change in temperature.

    • The formula can be used to calculate the stress caused by thermal expansion or contraction in piping systems.

    • The formula assumes that the mater...

  • Answered by AI
  • Q2. IBR LINES details.pressure ratings etc
  • Q3. Sustain stress formula
  • Ans. 

    Sustain stress formula calculates the maximum allowable stress for a given material under sustained loading.

    • Sustain stress formula is used in piping stress analysis to determine the maximum allowable stress for a given material under sustained loading.

    • The formula takes into account the material's yield strength, ultimate tensile strength, and safety factor.

    • Sustain stress formula is expressed as S = (Sy/FS) + (Su/FS) * ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically strong. Good knowledge of critical lines

Interview Questionnaire 

1 Question

  • Q1. MOC, calculations, standard, VMS, PMS,
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Heat exchanger pipping
  • Q2. Rack piping
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. How to place a pump with respect to Rack?
  • Ans. 

    The pump should be placed in a location that allows for easy maintenance and operation, while also considering the space and weight limitations of the rack.

    • Consider the flow direction and orientation of the pump

    • Ensure there is enough space for maintenance and repair

    • Take into account the weight of the pump and its impact on the rack

    • Consider the location of other equipment and piping in the area

  • Answered by AI
  • Q2. What is todo list in SP3D, Which type of error may be there,how to encounter them.
  • Ans. 

    Todo list in SP3D is a list of tasks to be completed. Errors may include missing information or incorrect data.

    • Todo list in SP3D is a list of tasks that need to be completed in the software.

    • Errors in the todo list may include missing information or incorrect data.

    • To encounter these errors, the user should carefully review the todo list and ensure that all necessary information is provided.

    • For example, if a piping desig...

  • Answered by AI
  • Q3. You may have to design a test model in SP3D,E3D.
  • Q4. What is the General arrangements be there of equipments.
Round 3 - HR 

(1 Question)

  • Q1. What is your view of society.
  • Ans. 

    Society is a complex web of individuals with diverse backgrounds, beliefs, and values.

    • Society is constantly evolving and changing.

    • It is important to recognize and respect the differences among individuals.

    • Social issues such as inequality, discrimination, and poverty need to be addressed.

    • Community involvement and support are crucial for a healthy society.

    • Education and awareness can help promote positive change.

    • Technolog...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Read Roger Hunt's Process & plant layout design book Throughlly. You will definitely crack it.

Toyo Engineering Interview FAQs

How to prepare for Toyo Engineering Piping Designer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Toyo Engineering. The most common topics and skills that interviewers at Toyo Engineering expect are PID, Piping, 2D Animation, 3D Animation and Civil Engineering.
What are the top questions asked in Toyo Engineering Piping Designer interview?

Some of the top questions asked at the Toyo Engineering Piping Designer interview -

  1. Pump suction and discharge Drum modell...read more
  2. Pump related Drum related Exchanger rela...read more
  3. Related to resume and oil and ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
Thermax Limited Interview Questions
4.1
 • 250 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
TechnipFMC Interview Questions
4.0
 • 69 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.1
 • 59 Interviews
View all
Toyo Engineering Piping Designer Salary
based on 64 salaries
₹2.1 L/yr - ₹10 L/yr
12% less than the average Piping Designer Salary in India
View more details

Toyo Engineering Piping Designer Reviews and Ratings

based on 8 reviews

4.0/5

Rating in categories

4.0

Skill development

2.1

Work-life balance

3.0

Salary

3.5

Job security

2.0

Company culture

2.8

Promotions

3.2

Work satisfaction

Explore 8 Reviews and Ratings
Senior Engineer
119 salaries
unlock blur

₹9.6 L/yr - ₹34 L/yr

Piping Engineer
112 salaries
unlock blur

₹4.3 L/yr - ₹14.2 L/yr

Senior Assistant Engineer
97 salaries
unlock blur

₹5 L/yr - ₹15.2 L/yr

Project Engineer
79 salaries
unlock blur

₹4.5 L/yr - ₹16 L/yr

Engineer
75 salaries
unlock blur

₹8 L/yr - ₹25.5 L/yr

Explore more salaries
Compare Toyo Engineering with

L&T Energy Hydrocarbon

3.8
Compare

Tata Projects

4.2
Compare

Thermax Limited

4.1
Compare

BGR Energy Systems

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview