Hazardous area classification is the process of identifying and categorizing areas where explosive atmospheres may occur.
Hazardous areas are classified based on the likelihood of an explosive atmosphere occurring and the duration of its presence.
There are three main factors that contribute to the formation of an explosive atmosphere: the presence of a flammable substance, oxygen, and an ignition source.
The classificati...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.
Toyo Engineering interview questions for popular designations
I applied via Job Portal and was interviewed in Jul 2021. There were 4 interview rounds.
Get interview-ready with Top Toyo Engineering Interview Questions
I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.
Safety valve selection criteria
The type of fluid or gas being handled
The pressure and temperature of the system
The flow rate and capacity of the valve
The set pressure and blowdown requirements
The material compatibility with the process fluid
The valve's reliability and maintenance requirements
Line sizing criteria is the process of selecting the appropriate diameter for a pipeline based on various factors.
Line sizing criteria is based on factors such as flow rate, pressure drop, fluid properties, and velocity limitations.
The selected diameter should ensure that the pressure drop is within acceptable limits and the fluid velocity is not too high or too low.
The type of fluid being transported also plays a role...
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
Finish items are the final touches in building construction that make it ready for occupancy.
Painting and finishing walls
Installing flooring and baseboards
Installing light fixtures and switches
Installing plumbing fixtures
Installing cabinetry and countertops
Landscaping and exterior finishing
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
Top trending discussions
The duration of Toyo Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 55 interviews
Interview experience
based on 609 reviews
Rating in categories
Senior Engineer
119
salaries
| ₹9.6 L/yr - ₹34 L/yr |
Piping Engineer
112
salaries
| ₹4.3 L/yr - ₹14.2 L/yr |
Senior Assistant Engineer
97
salaries
| ₹5 L/yr - ₹15.2 L/yr |
Project Engineer
79
salaries
| ₹4.5 L/yr - ₹16 L/yr |
Engineer
75
salaries
| ₹8 L/yr - ₹25.5 L/yr |
L&T Energy Hydrocarbon
Tata Projects
Thermax Limited
BGR Energy Systems