Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There was 1 interview round.
Top trending discussions
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I appeared for an interview in Feb 2025.
A fire pump room single line diagram illustrates the components and flow of water in fire protection systems.
Includes main components: fire pump, controller, water supply, and discharge piping.
Fire pump types: centrifugal, positive displacement, each suited for different applications.
Controller manages pump operation, ensuring automatic activation during fire alarms.
Water supply sources: municipal water, tanks, or rese...
Plumbing and fire fighting NBC code Standard etc.
I am excited to join your organization for its innovative projects, collaborative culture, and commitment to professional growth.
Innovative Projects: Your organization is known for cutting-edge technology, such as the recent AI-driven solutions that enhance user experience.
Collaborative Culture: I appreciate the emphasis on teamwork, as seen in your recent cross-departmental project that improved product delivery times...
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.
A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.
Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.
Monitor progress and quality of construction activities to meet project deadlines.
Ensure compliance with safety regulations and quality standards.
Resolve any issues o...
The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.
Consider the project timeline and deadlines for completion
Evaluate the size and complexity of the slabs to determine production rate
Assess the availability of resources such as manpower and equipment
Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...
Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.
Mivan shuttering is a fast-paced construction technique.
It involves setting up aluminum formwork to create the structure of walls and slabs.
The formwork is reusable and can be quickly assembled and dismantled.
Mivan shuttering results in smooth finishes on concrete surfaces.
It is commonly used in high-rise buildings and
Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.
Types of cement grades: OPC, PPC, PSC, etc.
M70 grade usually uses OPC cement.
OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this role.
I believe my compensation reflects my skills and contributions to my current employer.
The deduction in PF varies based on the employee's salary and the company's policy.
PF deduction is typically a percentage of the employee's basic salary
The current rate of PF deduction is 12% of the basic salary
Some companies may choose to match the employee's contribution to PF
Employees can also choose to contribute more than the mandatory 12%
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Young's Modulus is a measure of the stiffness of a material and its ability to withstand deformation under stress.
Young's Modulus is also known as the modulus of elasticity.
It is defined as the ratio of stress to strain in a material under tension or compression.
Materials with high Young's Modulus values are stiffer and more resistant to deformation.
For example, steel has a high Young's Modulus value compared to rubber
To find bearing capacity of sandy soil, conduct standard penetration test, determine soil type, calculate bearing capacity using appropriate formula.
Conduct standard penetration test (SPT) to determine soil properties
Identify soil type (sandy soil)
Calculate bearing capacity using appropriate formula (e.g. Terzaghi's bearing capacity equation)
Consider factors such as soil cohesion, angle of internal friction, and depth
I appeared for an interview in May 2022.
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
based on 1 interview
Interview experience
Assistant Manager
144
salaries
| ₹4.8 L/yr - ₹12.2 L/yr |
Senior Executive
47
salaries
| ₹3.8 L/yr - ₹7.3 L/yr |
Manager
43
salaries
| ₹8 L/yr - ₹18 L/yr |
Senior Manager
23
salaries
| ₹9.2 L/yr - ₹24 L/yr |
BIM Modeller
23
salaries
| ₹4 L/yr - ₹8 L/yr |
Knight Frank
M3M India
R.S. Infraprojects
SMEC