I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
The challenges faced at site include equipment breakdowns, safety hazards, and meeting production targets.
Equipment breakdowns can cause delays and require quick repairs to minimize downtime.
Safety hazards must be identified and addressed to ensure the well-being of workers.
Meeting production targets can be challenging due to unforeseen circumstances or unexpected changes in demand.
Coordination with other departments a...
I applied via Naukri.com and was interviewed in Dec 2021. There were 4 interview rounds.
BOD and COD are measurements used in STP plants to assess the organic pollution levels in wastewater.
BOD stands for Biochemical Oxygen Demand and measures the amount of dissolved oxygen required by microorganisms to break down organic matter in wastewater.
COD stands for Chemical Oxygen Demand and measures the amount of oxygen required to chemically oxidize organic and inorganic matter in wastewater.
Both BOD and COD are...
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
The challenges faced at site include equipment breakdowns, safety hazards, and meeting production targets.
Equipment breakdowns can cause delays and require quick repairs to minimize downtime.
Safety hazards must be identified and addressed to ensure the well-being of workers.
Meeting production targets can be challenging due to unforeseen circumstances or unexpected changes in demand.
Coordination with other departments a...
I applied via Naukri.com and was interviewed in Dec 2021. There were 4 interview rounds.
BOD and COD are measurements used in STP plants to assess the organic pollution levels in wastewater.
BOD stands for Biochemical Oxygen Demand and measures the amount of dissolved oxygen required by microorganisms to break down organic matter in wastewater.
COD stands for Chemical Oxygen Demand and measures the amount of oxygen required to chemically oxidize organic and inorganic matter in wastewater.
Both BOD and COD are...
based on 1 interview
Interview experience
based on 15 reviews
Rating in categories
Assistant Project Manager
144
salaries
| ₹5.2 L/yr - ₹12.2 L/yr |
Project Engineer
131
salaries
| ₹3.6 L/yr - ₹7.8 L/yr |
Assistant Manager
101
salaries
| ₹4 L/yr - ₹13 L/yr |
Assistant Facility Manager
96
salaries
| ₹2.9 L/yr - ₹7.2 L/yr |
Project Manager
94
salaries
| ₹7 L/yr - ₹18 L/yr |
CBRE
JLL
Colliers India
Cushman & Wakefield