I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Scheduling and monitoring techniques are essential for effective project management.
Utilize Gantt charts to visually represent project schedules
Implement Critical Path Method (CPM) to identify the longest sequence of tasks
Use Earned Value Management (EVM) to track project performance and cost
Regularly update schedules and monitor progress to ensure project stays on track
Cost control methods involve monitoring, analyzing, and managing project expenses to ensure they stay within budget.
Regularly tracking and comparing actual costs to budgeted costs
Implementing change control procedures to manage scope changes and their impact on costs
Utilizing cost forecasting techniques to predict future expenses
Identifying cost variances and taking corrective actions as needed
Establishing cost baselin
Top trending discussions
I appeared for an interview in Feb 2025.
A fire pump room single line diagram illustrates the components and flow of water in fire protection systems.
Includes main components: fire pump, controller, water supply, and discharge piping.
Fire pump types: centrifugal, positive displacement, each suited for different applications.
Controller manages pump operation, ensuring automatic activation during fire alarms.
Water supply sources: municipal water, tanks, or rese...
Plumbing and fire fighting NBC code Standard etc.
I am excited to join your organization for its innovative projects, collaborative culture, and commitment to professional growth.
Innovative Projects: Your organization is known for cutting-edge technology, such as the recent AI-driven solutions that enhance user experience.
Collaborative Culture: I appreciate the emphasis on teamwork, as seen in your recent cross-departmental project that improved product delivery times...
The procedure for building construction involves several steps and processes.
Developing a project plan and obtaining necessary permits
Clearing the construction site and preparing the foundation
Constructing the structural framework and installing utilities
Completing interior and exterior finishes
Conducting inspections and obtaining certificates of occupancy
Handing over the completed building to the owner
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Cost review techniques are used to evaluate and analyze project costs.
Cost-benefit analysis
Earned value management
Variance analysis
Life cycle costing
Activity-based costing
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Young's Modulus is a measure of the stiffness of a material and its ability to withstand deformation under stress.
Young's Modulus is also known as the modulus of elasticity.
It is defined as the ratio of stress to strain in a material under tension or compression.
Materials with high Young's Modulus values are stiffer and more resistant to deformation.
For example, steel has a high Young's Modulus value compared to rubber
To find bearing capacity of sandy soil, conduct standard penetration test, determine soil type, calculate bearing capacity using appropriate formula.
Conduct standard penetration test (SPT) to determine soil properties
Identify soil type (sandy soil)
Calculate bearing capacity using appropriate formula (e.g. Terzaghi's bearing capacity equation)
Consider factors such as soil cohesion, angle of internal friction, and depth
I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.
A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.
Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.
Monitor progress and quality of construction activities to meet project deadlines.
Ensure compliance with safety regulations and quality standards.
Resolve any issues o...
The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.
Consider the project timeline and deadlines for completion
Evaluate the size and complexity of the slabs to determine production rate
Assess the availability of resources such as manpower and equipment
Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...
Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.
Mivan shuttering is a fast-paced construction technique.
It involves setting up aluminum formwork to create the structure of walls and slabs.
The formwork is reusable and can be quickly assembled and dismantled.
Mivan shuttering results in smooth finishes on concrete surfaces.
It is commonly used in high-rise buildings and
Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.
Types of cement grades: OPC, PPC, PSC, etc.
M70 grade usually uses OPC cement.
OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this role.
I believe my compensation reflects my skills and contributions to my current employer.
The deduction in PF varies based on the employee's salary and the company's policy.
PF deduction is typically a percentage of the employee's basic salary
The current rate of PF deduction is 12% of the basic salary
Some companies may choose to match the employee's contribution to PF
Employees can also choose to contribute more than the mandatory 12%
I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.
Building materials have varying densities depending on their composition.
Density is the mass per unit volume of a material.
Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).
Density affects the strength and durability of a structure, as well as its weight and cost.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
144
salaries
| ₹4.8 L/yr - ₹12.2 L/yr |
Senior Executive
47
salaries
| ₹3.8 L/yr - ₹7.3 L/yr |
Manager
43
salaries
| ₹8 L/yr - ₹18 L/yr |
Senior Manager
23
salaries
| ₹9.2 L/yr - ₹24 L/yr |
BIM Modeller
23
salaries
| ₹4 L/yr - ₹8 L/yr |
Knight Frank
M3M India
R.S. Infraprojects
SMEC