I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Professional summary and reason to change
  • Q2. Current and expected salary.
  • Q3. Skills and cettifications
Round 3 - Technical 

(3 Questions)

  • Q1. Questions from professional experience
  • Q2. Scheduling and monitoring techniques
  • Ans. 

    Scheduling and monitoring techniques are essential for effective project management.

    • Utilize Gantt charts to visually represent project schedules

    • Implement Critical Path Method (CPM) to identify the longest sequence of tasks

    • Use Earned Value Management (EVM) to track project performance and cost

    • Regularly update schedules and monitor progress to ensure project stays on track

  • Answered by AI
  • Q3. Cost control methods
  • Ans. 

    Cost control methods involve monitoring, analyzing, and managing project expenses to ensure they stay within budget.

    • Regularly tracking and comparing actual costs to budgeted costs

    • Implementing change control procedures to manage scope changes and their impact on costs

    • Utilizing cost forecasting techniques to predict future expenses

    • Identifying cost variances and taking corrective actions as needed

    • Establishing cost baselin

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Procedure for building construction
  • Ans. 

    The procedure for building construction involves several steps and processes.

    • Developing a project plan and obtaining necessary permits

    • Clearing the construction site and preparing the foundation

    • Constructing the structural framework and installing utilities

    • Completing interior and exterior finishes

    • Conducting inspections and obtaining certificates of occupancy

    • Handing over the completed building to the owner

  • Answered by AI

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Primavera Schedule preparation
  • Q2. Cost review techniques
  • Ans. 

    Cost review techniques are used to evaluate and analyze project costs.

    • Cost-benefit analysis

    • Earned value management

    • Variance analysis

    • Life cycle costing

    • Activity-based costing

  • Answered by AI
  • Q3. Time delay analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to have grip on Primavera scheduling
Earned value analysis
Planning basics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Labour productivity
  • Q2. Master plan details
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Ready to locate for panipat
  • Ans. 

    Yes, I am ready to locate for Panipat.

    • I am willing to relocate to Panipat for the Senior Planning Manager position.

    • I understand the importance of being physically present in the location for effective planning and management.

    • I have researched about Panipat and its industrial landscape, which aligns with my expertise.

    • I am excited about the opportunity to contribute to the growth and success of the company in Panipat.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. How you know about planning and how is your contribution

Interview Preparation Tips

Topics to prepare for M3M India Senior Manager Planning interview:
  • Planning
  • Schedule
  • Budgeting
  • Costing
  • Productivity
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Some Basic of related fields
  • Q2. Past working details and Experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Well growths and lots of learning in here.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Procedure for building construction
  • Ans. 

    The procedure for building construction involves several steps and processes.

    • Developing a project plan and obtaining necessary permits

    • Clearing the construction site and preparing the foundation

    • Constructing the structural framework and installing utilities

    • Completing interior and exterior finishes

    • Conducting inspections and obtaining certificates of occupancy

    • Handing over the completed building to the owner

  • Answered by AI

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Primavera Schedule preparation
  • Q2. Cost review techniques
  • Ans. 

    Cost review techniques are used to evaluate and analyze project costs.

    • Cost-benefit analysis

    • Earned value management

    • Variance analysis

    • Life cycle costing

    • Activity-based costing

  • Answered by AI
  • Q3. Time delay analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to have grip on Primavera scheduling
Earned value analysis
Planning basics

Total Environment Building Systems Interview FAQs

How many rounds are there in Total Environment Building Systems Planning Engineer interview?
Total Environment Building Systems interview process usually has 3 rounds. The most common rounds in the Total Environment Building Systems interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Total Environment Building Systems Planning Engineer interview?

Some of the top questions asked at the Total Environment Building Systems Planning Engineer interview -

  1. Scheduling and monitoring techniq...read more
  2. Cost control meth...read more
  3. Skills and cettificati...read more

Tell us how to improve this page.

Total Environment Building Systems Planning Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
Total Environment Building Systems Planning Engineer Salary
based on 10 salaries
₹4 L/yr - ₹8.8 L/yr
18% less than the average Planning Engineer Salary in India
View more details

Total Environment Building Systems Planning Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

3.3

Skill development

5.0

Work-life balance

3.9

Salary

4.8

Job security

5.0

Company culture

4.7

Promotions

3.1

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
135 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Senior Executive
47 salaries
unlock blur

₹3.8 L/yr - ₹7.3 L/yr

Manager
41 salaries
unlock blur

₹8 L/yr - ₹18 L/yr

Senior Manager
25 salaries
unlock blur

₹9.2 L/yr - ₹22 L/yr

BIM Modeller
25 salaries
unlock blur

₹4 L/yr - ₹8 L/yr

Explore more salaries
Compare Total Environment Building Systems with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Brigade Group

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview