Upload Button Icon Add office photos

Filter interviews by

Total Environment Building Systems Planning Engineer Interview Questions and Answers

Updated 20 Jul 2023

Total Environment Building Systems Planning Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Professional summary and reason to change
  • Q2. Current and expected salary.
  • Q3. Skills and cettifications
Round 3 - Technical 

(3 Questions)

  • Q1. Questions from professional experience
  • Q2. Scheduling and monitoring techniques
  • Ans. 

    Scheduling and monitoring techniques are essential for effective project management.

    • Utilize Gantt charts to visually represent project schedules

    • Implement Critical Path Method (CPM) to identify the longest sequence of tasks

    • Use Earned Value Management (EVM) to track project performance and cost

    • Regularly update schedules and monitor progress to ensure project stays on track

  • Answered by AI
  • Q3. Cost control methods
  • Ans. 

    Cost control methods involve monitoring, analyzing, and managing project expenses to ensure they stay within budget.

    • Regularly tracking and comparing actual costs to budgeted costs

    • Implementing change control procedures to manage scope changes and their impact on costs

    • Utilizing cost forecasting techniques to predict future expenses

    • Identifying cost variances and taking corrective actions as needed

    • Establishing cost baselin

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - Technical 

(3 Questions)

  • Q1. Basic fundamentals of plumbing and fire fighting system.
  • Q2. Fire pump room single line diagram and working.
  • Ans. 

    A fire pump room single line diagram illustrates the components and flow of water in fire protection systems.

    • Includes main components: fire pump, controller, water supply, and discharge piping.

    • Fire pump types: centrifugal, positive displacement, each suited for different applications.

    • Controller manages pump operation, ensuring automatic activation during fire alarms.

    • Water supply sources: municipal water, tanks, or rese...

  • Answered by AI
  • Q3. Fire pump technical data sheet detail.
Round 2 - Group Discussion 

Plumbing and fire fighting NBC code Standard etc.

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion.
  • Q2. Why to join our organisation.
  • Ans. 

    I am excited to join your organization for its innovative projects, collaborative culture, and commitment to professional growth.

    • Innovative Projects: Your organization is known for cutting-edge technology, such as the recent AI-driven solutions that enhance user experience.

    • Collaborative Culture: I appreciate the emphasis on teamwork, as seen in your recent cross-departmental project that improved product delivery times...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Procedure for building construction
  • Ans. 

    The procedure for building construction involves several steps and processes.

    • Developing a project plan and obtaining necessary permits

    • Clearing the construction site and preparing the foundation

    • Constructing the structural framework and installing utilities

    • Completing interior and exterior finishes

    • Conducting inspections and obtaining certificates of occupancy

    • Handing over the completed building to the owner

  • Answered by AI

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Primavera Schedule preparation
  • Q2. Cost review techniques
  • Ans. 

    Cost review techniques are used to evaluate and analyze project costs.

    • Cost-benefit analysis

    • Earned value management

    • Variance analysis

    • Life cycle costing

    • Activity-based costing

  • Answered by AI
  • Q3. Time delay analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to have grip on Primavera scheduling
Earned value analysis
Planning basics

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Youngs Modulus
  • Ans. 

    Young's Modulus is a measure of the stiffness of a material and its ability to withstand deformation under stress.

    • Young's Modulus is also known as the modulus of elasticity.

    • It is defined as the ratio of stress to strain in a material under tension or compression.

    • Materials with high Young's Modulus values are stiffer and more resistant to deformation.

    • For example, steel has a high Young's Modulus value compared to rubber

  • Answered by AI
  • Q2. How to find bearing capacity of sandy soil
  • Ans. 

    To find bearing capacity of sandy soil, conduct standard penetration test, determine soil type, calculate bearing capacity using appropriate formula.

    • Conduct standard penetration test (SPT) to determine soil properties

    • Identify soil type (sandy soil)

    • Calculate bearing capacity using appropriate formula (e.g. Terzaghi's bearing capacity equation)

    • Consider factors such as soil cohesion, angle of internal friction, and depth

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(6 Questions)

  • Q1. What is your current job role & responsibility?
  • Q2. How to manage site as a project engineer.
  • Ans. 

    A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.

    • Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.

    • Monitor progress and quality of construction activities to meet project deadlines.

    • Ensure compliance with safety regulations and quality standards.

    • Resolve any issues o...

  • Answered by AI
  • Q3. How much number of slab to give in one months.
  • Ans. 

    The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.

    • Consider the project timeline and deadlines for completion

    • Evaluate the size and complexity of the slabs to determine production rate

    • Assess the availability of resources such as manpower and equipment

    • Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...

  • Answered by AI
  • Q4. What is the mivan shuttering.
  • Ans. 

    Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.

    • Mivan shuttering is a fast-paced construction technique.

    • It involves setting up aluminum formwork to create the structure of walls and slabs.

    • The formwork is reusable and can be quickly assembled and dismantled.

    • Mivan shuttering results in smooth finishes on concrete surfaces.

    • It is commonly used in high-rise buildings and

  • Answered by AI
  • Q5. Types of cement grade and which grade used in M70.
  • Ans. 

    Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.

    • Types of cement grades: OPC, PPC, PSC, etc.

    • M70 grade usually uses OPC cement.

    • OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.

  • Answered by AI
  • Q6. How much experience you have in high rise building.
Round 2 - HR 

(4 Questions)

  • Q1. What is your current salary?
  • Ans. 

    I am currently earning a competitive salary based on my experience and qualifications.

    • My current salary is in line with industry standards.

    • I am open to discussing salary expectations for this role.

    • I believe my compensation reflects my skills and contributions to my current employer.

  • Answered by AI
  • Q2. How much deduction in PF.
  • Ans. 

    The deduction in PF varies based on the employee's salary and the company's policy.

    • PF deduction is typically a percentage of the employee's basic salary

    • The current rate of PF deduction is 12% of the basic salary

    • Some companies may choose to match the employee's contribution to PF

    • Employees can also choose to contribute more than the mandatory 12%

  • Answered by AI
  • Q3. Your expectation salary breakup.
  • Q4. Provide last 3 months salary slips and other documents.

Interview Preparation Tips

Interview preparation tips for other job seekers - Before go to the interview in M3M you should clear the current job responsibility and all technical knowledge related your field.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Labour productivity
  • Q2. Master plan details
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Density of building materials
  • Ans. 

    Building materials have varying densities depending on their composition.

    • Density is the mass per unit volume of a material.

    • Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).

    • Density affects the strength and durability of a structure, as well as its weight and cost.

  • Answered by AI
  • Q3. Billing procedure of your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join if they told you to join in contracting division.

Total Environment Building Systems Interview FAQs

How many rounds are there in Total Environment Building Systems Planning Engineer interview?
Total Environment Building Systems interview process usually has 3 rounds. The most common rounds in the Total Environment Building Systems interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Total Environment Building Systems Planning Engineer interview?

Some of the top questions asked at the Total Environment Building Systems Planning Engineer interview -

  1. Scheduling and monitoring techniq...read more
  2. Cost control meth...read more
  3. Skills and cettificati...read more

Tell us how to improve this page.

Total Environment Building Systems Planning Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.1
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Knight Frank Interview Questions
4.0
 • 44 Interviews
Smartworks Interview Questions
3.6
 • 33 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
SMEC Interview Questions
3.7
 • 27 Interviews
Xanadu Interview Questions
3.5
 • 26 Interviews
View all
Total Environment Building Systems Planning Engineer Salary
based on 12 salaries
₹3 L/yr - ₹8.8 L/yr
10% less than the average Planning Engineer Salary in India
View more details

Total Environment Building Systems Planning Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

3.3

Skill development

5.0

Work-life balance

3.9

Salary

4.8

Job security

5.0

Company culture

4.7

Promotions

3.1

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
144 salaries
unlock blur

₹4.8 L/yr - ₹12.2 L/yr

Senior Executive
47 salaries
unlock blur

₹3.8 L/yr - ₹7.3 L/yr

Manager
43 salaries
unlock blur

₹8 L/yr - ₹18 L/yr

Senior Manager
23 salaries
unlock blur

₹9.2 L/yr - ₹24 L/yr

BIM Modeller
23 salaries
unlock blur

₹4 L/yr - ₹8 L/yr

Explore more salaries
Compare Total Environment Building Systems with

Knight Frank

4.0
Compare

M3M India

4.1
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview