Filter interviews by
Be the first one to contribute and help others!
posted on 3 May 2019
I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.
I am currently earning $60,000 per year.
My current salary is $60,000 per year.
I am satisfied with my current salary.
I believe my salary reflects my experience and qualifications.
posted on 13 May 2018
I was interviewed before May 2017.
posted on 12 Sep 2021
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed in Aug 2021. There was 1 interview round.
posted on 2 Jul 2021
The capacity of the plant is 1000 units per day.
The plant has a daily production capacity of 1000 units.
The capacity is measured in terms of the number of units produced per day.
This information is crucial for planning and scheduling production activities.
posted on 4 Apr 2021
Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (Large...
posted on 18 Dec 2020
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
posted on 24 Oct 2020
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
The amount of cement used for making 1m³ of concrete varies depending on the desired strength and type of concrete.
The cement content typically ranges from 300 to 400 kg/m³ for general-purpose concrete.
For high-strength concrete, the cement content can be as high as 500 kg/m³ or more.
The water-cement ratio also affects the amount of cement required.
Admixtures and additives may be used to modify the properties of the co...
The amount of steel used for 1m³ concreting varies depending on the type of concrete and the structural requirements.
The steel used in concrete is typically in the form of reinforcing bars (rebar) or welded wire mesh.
The amount of steel required for 1m³ of concrete depends on the structural requirements and the type of concrete being used.
For example, a standard reinforced concrete slab may require 70-100 kg of steel p...
posted on 17 Aug 2020
I follow my dwm by regularly reviewing and updating my work plan.
I create a detailed work plan at the beginning of each project
I regularly review my progress and adjust my plan as needed
I prioritize tasks based on their importance and urgency
I communicate with my team to ensure we are all on the same page
I track my time and make adjustments to my schedule as needed
7 QC and Core Tools are quality control methodologies used in manufacturing and service industries.
7 QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
Core tools include APQP, PPAP, FMEA, MSA, and SPC.
These tools help in identifying and solving quality-related issues, improving processes, and reducing defects.
They are widely used in industries...
Quality management system is a set of policies, processes, and procedures required for planning and execution of quality control.
It ensures that products or services meet customer requirements and expectations.
It involves continuous improvement and monitoring of processes.
ISO 9001 is a widely recognized standard for quality management systems.
It includes activities such as quality planning, quality control, and quality...
Larsen & Toubro Limited
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group