Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.
Develop project schedules using software like Primavera P6
Monitor project progress and identify potential delays
Coordinate with various teams to ensure timely completion
Prepare reports on project status and communicate with stakeholders
Implement changes to the schedule as needed to keep the project on
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the shortest possible duration for completing the project.
Any delay in tasks on the critical path will directly impact the project's overall timeline.
Activities on the critical path have ...
Density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel is approximately 7.85 g/cm^3.
Different types of steel may have slightly different densities.
Weight of steel can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel (length x width x height)
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight
Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg
Number of tiles can be calculated by determining the area to be covered and the size of each tile.
Calculate the total area to be covered by multiplying the length and width of the space.
Determine the size of each tile in square units.
Divide the total area by the size of each tile to get the number of tiles needed.
Consider adding extra tiles for cuts and wastage.
For example, if a room is 10 feet by 12 feet and each tile
I was interviewed before Sep 2021.
Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify available resources and constraints
Create a detailed project schedule
Monitor progress and make adjustments as necessary
The planning process involves identifying objectives, determining resources, and creating a timeline for completion.
Identify project objectives and goals
Determine available resources and constraints
Create a detailed project plan with timelines and milestones
Monitor progress and make adjustments as necessary
Communicate with stakeholders and team members throughout the process
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Baseline schedules should be updated regularly to reflect changes in project scope, timeline, and resources.
Baseline schedules should be updated at key project milestones or when significant changes occur.
Regular updates ensure that the schedule remains accurate and reflects the current status of the project.
Updates should be communicated to all stakeholders to keep them informed of any changes.
Examples of changes that...
Crashing of schedule is a technique used in project management to shorten the project duration by adding more resources.
Crashing involves adding more resources to critical path activities to reduce the overall project duration.
It is typically used when there is a need to meet a deadline or when there are financial incentives for early completion.
Crashing may increase project costs due to the additional resources requir...
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Various types of trackers used for project monitoring include Gantt charts, milestone trackers, budget trackers, and resource trackers.
Gantt charts: Visual representation of project tasks and timelines
Milestone trackers: Monitoring key project milestones and deadlines
Budget trackers: Tracking project expenses and budget allocations
Resource trackers: Monitoring the allocation and utilization of project resources
Types of constraints in scheduling include resource constraints, time constraints, and dependencies.
Resource constraints: limitations on the availability of resources such as equipment, materials, or personnel
Time constraints: deadlines or specific time frames that must be adhered to
Dependencies: tasks that are dependent on the completion of other tasks before they can begin
Examples: A construction project may have res...
Levels of scheduling refer to the different stages of planning and organizing tasks in a project timeline.
Levels of scheduling include strategic, tactical, and operational planning.
Strategic planning involves setting long-term goals and objectives for the project.
Tactical planning focuses on specific actions and resources needed to achieve the strategic goals.
Operational planning deals with day-to-day tasks and schedul...
Productivity of different items in construction project varies based on factors like complexity, labor skill level, and equipment availability.
Productivity can be influenced by factors such as complexity of the task, skill level of laborers, availability of equipment, and weather conditions.
For example, installing basic electrical wiring may have higher productivity compared to installing specialized HVAC systems.
Effic...
Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.
Calculate the dimensions of the project area
Determine the materials needed for the project
Estimate the quantities of materials required based on the dimensions and specifications
Consider factors such as wastage and additional materials for contingencies
Use software tools like AutoCAD or Excel for accurate calculati
Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.
Identify all costs associated with the project or operation, including direct and indirect costs.
Break down costs into categories such as labor, materials, equipment, overhead, and contingency.
Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.
Use...
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
Yes, I am ready to locate for Panipat.
I am willing to relocate to Panipat for the Senior Planning Manager position.
I understand the importance of being physically present in the location for effective planning and management.
I have researched about Panipat and its industrial landscape, which aligns with my expertise.
I am excited about the opportunity to contribute to the growth and success of the company in Panipat.
I applied via Referral and was interviewed in May 2020. There was 1 interview round.
Code for method of measurement is a standardized set of rules and guidelines used to quantify and evaluate the work done in a construction project.
Codes for method of measurement provide a uniform and consistent way to measure quantities in construction projects.
They help in accurately estimating costs, monitoring progress, and resolving disputes.
Examples include CESMM (Civil Engineering Standard Method of Measurement)...