The process of slab involves preparing the formwork, placing reinforcement, pouring concrete, and finishing the surface.
Prepare the formwork to define the shape and size of the slab.
Place reinforcement such as steel bars or mesh to provide strength and prevent cracking.
Pour concrete into the formwork and ensure it is properly leveled and compacted.
Finish the surface by smoothing it out and applying any desired textures...
Layout process involves planning and marking out the position of structures and components on a construction site.
Start by reviewing the construction drawings and specifications
Identify key reference points and establish benchmarks
Use tools such as tape measures, levels, and string lines for accurate measurements
Mark out the positions of foundations, walls, columns, and other structural elements
Verify the layout before
Top trending discussions
posted on 24 Oct 2024
It was easy sorting questions
posted on 21 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.
Computer base test Technical & Reasoning questions
posted on 8 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
posted on 23 Dec 2023
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
Progress between job planning and target is monitored closely to ensure project stays on schedule.
Regularly track progress against the project schedule
Identify any delays or obstacles and address them promptly
Adjust the plan as needed to stay on track
Communicate with stakeholders about any changes or updates
Use project management software to help monitor progress
posted on 26 Sep 2023
Questions upon aptitude.
Project details with cost.
posted on 20 May 2023
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
The deadmen depth depends on the soil type and the load-bearing capacity of the soil.
Deadmen depth is the depth at which deadmen are installed to anchor retaining walls or other structures.
It is determined by the soil type and the load-bearing capacity of the soil.
For example, in sandy soil, the deadmen depth may need to be deeper than in clay soil.
The depth can also vary depending on the height and weight of the struc
posted on 24 Oct 2024
It was easy sorting questions
posted on 18 Nov 2023
I applied via LinkedIn and was interviewed in May 2023. There were 4 interview rounds.
Genral aptitude test
posted on 8 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
Interview experience
based on 77 reviews
Rating in categories
Deputy Manager
1.1k
salaries
| ₹5.7 L/yr - ₹17 L/yr |
Assistant Manager
851
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Manager
399
salaries
| ₹8 L/yr - ₹24.1 L/yr |
Senior Engineer
380
salaries
| ₹3.5 L/yr - ₹11.6 L/yr |
Senior Manager
357
salaries
| ₹10.4 L/yr - ₹32.5 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company