KEC International Senior Engineer Construction Interview Questions and Answers

Updated 20 May 2023

KEC International Senior Engineer Construction Interview Experiences

1 interview found

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How many Deadment Depth
  • Ans. 

    The deadmen depth depends on the soil type and the load-bearing capacity of the soil.

    • Deadmen depth is the depth at which deadmen are installed to anchor retaining walls or other structures.

    • It is determined by the soil type and the load-bearing capacity of the soil.

    • For example, in sandy soil, the deadmen depth may need to be deeper than in clay soil.

    • The depth can also vary depending on the height and weight of the struc

  • Answered by AI
  • Q2. Minimum 5ft and Check proper depth
Round 2 - HR 

(1 Question)

  • Q1. Why you Change your current job

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Santiniketan institute of polytechnic

Round 3 - No 

(2 Questions)

  • Q1. RCC building construction Metro project Surveying, Highway construction, site Engineer
  • Q2. No question of the best

Interview Preparation Tips

Interview preparation tips for other job seekers - Good 👍
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Aptitude Test 

For experienced candidates Management team give interview one by one by person or virtual and questioned on past experience in candidate CV. GK & Salary negotiation is also a part of interview.

Round 2 - HR 

(1 Question)

  • Q1. Checking of credentials and certificates

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management & frequent transfer at any where of world should be discussed with family members and plan to handle those situations prior to accept call leter.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly
Round 1 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - What you know told boldly and answer with smile

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

KEC International Interview FAQs

How many rounds are there in KEC International Senior Engineer Construction interview?
KEC International interview process usually has 3 rounds. The most common rounds in the KEC International interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in KEC International Senior Engineer Construction interview?

Some of the top questions asked at the KEC International Senior Engineer Construction interview -

  1. How many Deadment De...read more
  2. Minimum 5ft and Check proper de...read more

Tell us how to improve this page.

KEC International Senior Engineer Construction Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 757 Interviews
Tata Projects Interview Questions
4.2
 • 449 Interviews
Dilip Buildcon Interview Questions
4.0
 • 146 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all
KEC International Senior Engineer Construction Salary
based on 5 salaries
₹8.7 L/yr - ₹10.8 L/yr
8% more than the average Senior Engineer Construction Salary in India
View more details

KEC International Senior Engineer Construction Reviews and Ratings

based on 3 reviews

3.1/5

Rating in categories

3.0

Skill development

3.1

Work-life balance

3.2

Salary

3.6

Job security

3.5

Company culture

2.8

Promotions

2.7

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
659 salaries
unlock blur

₹5.2 L/yr - ₹20 L/yr

Senior Engineer
453 salaries
unlock blur

₹4.3 L/yr - ₹14 L/yr

Civil Engineer
221 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Safety Officer
191 salaries
unlock blur

₹1.8 L/yr - ₹8 L/yr

Engineer
187 salaries
unlock blur

₹2.5 L/yr - ₹10 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview