Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Assistant Construction Manager Interview Questions and Answers for Experienced

Updated 23 Feb 2024

Tata Projects Assistant Construction Manager Interview Experiences for Experienced

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. D-Wall. Site Executive
Round 2 - Technical 

(1 Question)

  • Q1. Under ground metro construction process
  • Ans. 

    Underground metro construction involves excavation, tunneling, station construction, and track installation.

    • Excavation of tunnels using tunnel boring machines or cut-and-cover method

    • Station construction including platform, concourse, and entrance structures

    • Installation of tracks, signaling systems, and electrical components

    • Ventilation and emergency exit construction for safety measures

  • Answered by AI

I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Erection plan,ASME B 31.3,
  • Q2. Fitup ,fittings,valve
  • Q3. Isoclearance,Mechanical clearance

Interview Preparation Tips

Interview preparation tips for other job seekers - Follow your CV ,and dont overconfidant

Assistant Construction Manager Interview Questions Asked at Other Companies for Experienced

Q1. how much load is taking by adjustable props for shuttering works.
Q2. How many types of shuttering methods & advantages for each.
Q3. What type of safety measures you follow during the construction w ... read more
Q4. What is the complete process for documentation and obtaining all ... read more
Q5. What was the minimum number of days for the Mivan shuttering slab ... read more

I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Pipeline &Civil work

Interview Preparation Tips

Interview preparation tips for other job seekers - Pl do prepare your relavant experiance.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. All about core knowledge in specified sector of my existing work experience.
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and other benefits.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep things short and simple, answer only what is asked precisely and to the point. Don't show over confidence. Prepare for core of your previous work related topics.

I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basics of Electrical Engineering, some important formulae. Details of Internships & industrial training like what have you learnt, what was the industry process & discipline related questions with respect ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare & focus mainly on your final project.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Experienced bassed questions only

Interview Preparation Tips

Interview preparation tips for other job seekers - Just don't fear that your interview,just answer what you know.
But should be confident on answer.
Maximum after some experience, interviewer only asks u on experience based questions..recall ur experience before attending interview.
Because opposite person is quite experienced that you,and your answer should be experienced way

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Assistant Construction Manager interview for experienced candidates?
Tata Projects interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the Tata Projects interview process for experienced candidates are Technical.
What are the top questions asked in Tata Projects Assistant Construction Manager interview for experienced candidates?

Some of the top questions asked at the Tata Projects Assistant Construction Manager interview for experienced candidates -

  1. Under ground metro construction proc...read more
  2. Isoclearance,Mechanical cleara...read more
  3. Erection plan,ASME B 31...read more

Tell us how to improve this page.

Tata Projects Assistant Construction Manager Interview Process for Experienced

based on 1 interview

1 Interview rounds

  • Technical Round
View more
Join Tata Projects Simplify. Create.

Interview Questions from Similar Companies

KEC International Interview Questions
4.0
 • 317 Interviews
TCE Interview Questions
3.8
 • 252 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all
Tata Projects Assistant Construction Manager Salary
based on 137 salaries
₹5.5 L/yr - ₹14 L/yr
19% less than the average Assistant Construction Manager Salary in India
View more details

Tata Projects Assistant Construction Manager Reviews and Ratings

based on 40 reviews

4.3/5

Rating in categories

4.1

Skill development

3.7

Work-life balance

4.3

Salary

4.3

Job security

4.0

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 40 Reviews and Ratings
Deputy Manager
1.2k salaries
unlock blur

₹5.8 L/yr - ₹17.5 L/yr

Assistant Manager
727 salaries
unlock blur

₹4 L/yr - ₹14.8 L/yr

Manager
416 salaries
unlock blur

₹8 L/yr - ₹22 L/yr

Senior Engineer
395 salaries
unlock blur

₹3.5 L/yr - ₹13.5 L/yr

Senior Manager
340 salaries
unlock blur

₹10.4 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

KEC International

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview