i
Tata AutoComp Systems
Filter interviews by
I applied via Referral and was interviewed in Dec 2022. There were 3 interview rounds.
There are three main types of defects in engineering: design defects, manufacturing defects, and usage defects.
Design defects occur when there is an issue with the initial design of a product, leading to problems in its functionality or safety. For example, a car with a faulty braking system due to a design flaw.
Manufacturing defects happen during the production process, resulting in a product that does not meet the in...
The 7 wastes refer to inefficiencies in a process that can be eliminated to improve productivity and quality.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to waste of resources
Motion: Unnecessary movement of people
Waiting: Idle time in a process
Overproduction: Producing more than needed
Overprocessing: Doing more work than necessary
Defects: Errors that require rework or
Line balance refers to distributing workload evenly among different stations in a production line to optimize efficiency.
Line balance ensures that each station in the production line has a similar amount of work to do.
It helps in preventing bottlenecks and maximizing throughput.
Line balance can be achieved by adjusting the cycle times at each station or by adding/subtracting workstations.
An example of line balance is i...
To reduce defects and increase productivity, focus on continuous improvement, training, quality control, and efficient processes.
Implement a quality control system to catch defects early on
Provide regular training to employees to improve skills and knowledge
Analyze data to identify root causes of defects and implement corrective actions
Streamline processes to eliminate waste and improve efficiency
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Factors affecting OEE include equipment downtime, speed loss, and defects in production.
Improving OEE involves reducing downtime, increasing production speed, and minimizing defects.
For example, implementing preventive maintenance can reduce eq
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Tata AutoComp Systems interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
Yes, I have worked before in various internships and part-time positions.
I have completed internships at ABC Company and XYZ Organization.
I have worked part-time as a sales associate at Retail Store.
I have also volunteered at local community events.
I have gained valuable experience and skills from my previous work experiences.
Get interview-ready with Top Tata AutoComp Systems Interview Questions
I applied via Approached by Company
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
Supplier evaluation process involves assessing supplier performance to ensure quality and reliability.
Establish criteria for evaluation such as quality, cost, delivery time, and customer service
Collect data on supplier performance through surveys, audits, and feedback
Analyze the data to identify strengths and weaknesses of each supplier
Use the evaluation results to make informed decisions on supplier selection and impr...
Address the issue directly and try to understand the reasons behind the lack of cooperation.
Have a one-on-one conversation with the subordinate to discuss the issue openly and professionally.
Listen to their concerns and try to find a solution together.
Provide clear expectations and feedback on their performance.
Offer support and resources to help them improve their cooperation.
If the issue persists, involve HR or highe...
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Quality tools used in industry help improve processes and products.
Six Sigma: A data-driven approach to improve quality by reducing defects
Kaizen: Continuous improvement philosophy to enhance efficiency
Pareto Analysis: Identifying and prioritizing problems based on the 80/20 rule
Fishbone Diagram: Visual tool to identify root causes of problems
Control Charts: Monitoring process variation over time
I will solve Quality related problems by identifying root causes, implementing corrective actions, and continuously monitoring for improvements.
Identify the root cause of the quality problem through data analysis and process evaluation
Implement corrective actions to address the identified issues
Establish quality control measures to prevent future problems
Continuously monitor and evaluate the effectiveness of the soluti...
Top trending discussions
Some of the top questions asked at the Tata AutoComp Systems interview -
The duration of Tata AutoComp Systems interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 87 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Chennai,
Bangalore / Bengaluru
5-10 Yrs
Not Disclosed
Assistant Manager
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
217
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
178
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane Group