I applied via Referral and was interviewed in Oct 2020. There were 5 interview rounds.
There are several file extensions used in Revit, including .rvt, .rfa, .rte, .rft, .rte, .rte, .rvtl, .rvtz, .rvtc, .rvtm, .rvtlink, .rvtserver, .rvtjournal, .rvtlib, .rvtlog, .rvttmp, .rvtstate, .rvtbackup, .rvtjournal, .rvtserver, .rvtlib, .rvtlog, .rvttmp, .rvtstate, .rvtbackup
The most common file extension in Revit is .rvt, which is used for project files
.rfa is used for family files, which contain individual build...
To model an I-Beam and a set of piles, pile caps, pier and pier cap in Revit, follow these steps:
Create a new project and set the units to the desired scale.
Use the Structural Framing tool to create the I-Beam.
Use the Structural Foundation tool to create the piles, pile caps, pier, and pier cap.
Add dimensions and annotations to the model as needed.
Save the model and export it in the desired format.
Lap length is the amount of overlap between two reinforcing bars in a concrete structure.
Lap length is determined by the diameter of the bars and the strength of the concrete.
It is important to follow the lap length requirements to ensure the structural integrity of the building.
Lap length can vary depending on the type of reinforcement used and the specific design of the structure.
For example, lap length for tension b...
Reinforcement placing in a pile involves placing steel bars or cages inside a drilled hole before pouring concrete.
Reinforcement is placed in a pile to increase its strength and stability.
The size and spacing of the reinforcement bars are determined by the design requirements.
The reinforcement is usually placed in a cage or bundle and lowered into the drilled hole.
The cage or bundle is then secured in place and the con...
I applied via Company Website and was interviewed in Oct 2020. There was 1 interview round.
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I faced a critical project deadline with unexpected technical challenges, requiring quick problem-solving and team collaboration.
Led a team during a major software deployment that faced unexpected bugs just days before launch.
Implemented a rapid response strategy, organizing daily stand-ups to address issues in real-time.
Collaborated with cross-functional teams to identify root causes and develop effective solutions.
Su...
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Site Engineer
45
salaries
| ₹6 L/yr - ₹14.2 L/yr |
Section Engineer
43
salaries
| ₹7.3 L/yr - ₹20 L/yr |
Structural Design Engineer
37
salaries
| ₹4.8 L/yr - ₹17.6 L/yr |
Structural Engineer
35
salaries
| ₹5 L/yr - ₹15 L/yr |
Project Management Officer
27
salaries
| ₹5.3 L/yr - ₹10 L/yr |
L&T Construction
Saint-Gobain
AECOM
AtkinsRealis