posted on 19 Jul 2023
Copy monitor in Autodesk Revit is a tool used to monitor changes in linked models and synchronize them with the current model.
Copy monitor allows users to track changes in linked models and update them in the current model.
It helps maintain consistency between different models in a project.
Users can easily identify and resolve conflicts or discrepancies between linked models.
Copy monitor can be used for elements like g
Shared parameter is a parameter that can be used across multiple elements in a project.
Shared parameters allow for consistent data across different elements in a project.
They can be created and managed in software like Revit for BIM projects.
Examples include shared parameters for material types, cost estimates, or project phases.
Import CAD brings a copy of the CAD file into the current project, while Link CAD creates a reference to the original CAD file.
Import CAD creates a duplicate of the CAD file within the project, increasing file size.
Link CAD maintains a connection to the original CAD file, allowing for real-time updates.
Changes made to the original CAD file will reflect in the linked CAD file, but not in the imported CAD file.
Import CAD...
Building Information Modelling (BIM) is a digital representation of the physical and functional characteristics of a building.
BIM is a collaborative process that allows multiple stakeholders to work together on a building project.
It involves creating and managing digital representations of the physical and functional characteristics of a building.
BIM helps in improving coordination, efficiency, and accuracy in the desi...
posted on 28 Jul 2022
I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.
The process to build an Etabs model involves defining the geometry, assigning properties and loads, and analyzing the structure.
Define the geometry of the structure using nodes, lines, and areas
Assign properties to the elements such as material type, section size, and boundary conditions
Apply loads to the structure such as dead loads, live loads, and seismic loads
Analyze the structure using the software's analysis tool...
Lateral forces in a building flow from the top to the bottom through the structural system.
Lateral forces are caused by wind, earthquakes, and other external factors.
The building's structural system, including walls, columns, and beams, must be designed to resist these forces.
The lateral forces are transferred from the top of the building to the foundation through the structural system.
The foundation must be designed t...
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
based on 9 reviews
Rating in categories
Structural Engineer
43
salaries
| ₹5 L/yr - ₹15 L/yr |
Structural Design Engineer
37
salaries
| ₹4.8 L/yr - ₹18 L/yr |
Section Engineer
34
salaries
| ₹7.3 L/yr - ₹20 L/yr |
Site Engineer
28
salaries
| ₹4 L/yr - ₹11.5 L/yr |
Project Management Officer
26
salaries
| ₹5.3 L/yr - ₹10 L/yr |
L&T Construction
Saint-Gobain
AECOM
AtkinsRealis