Bim Technician

Bim Technician Interview Questions and Answers

Updated 10 Apr 2021

Q1. How many types of file extension are there in revit?

Ans.

There are several file extensions used in Revit, including .rvt, .rfa, .rte, .rft, .rte, .rte, .rvtl, .rvtz, .rvtc, .rvtm, .rvtlink, .rvtserver, .rvtjournal, .rvtlib, .rvtlog, .rvttmp, .rvtstate, .rvtbackup, .rvtjournal, .rvtserver, .rvtlib, .rvtlog, .rvttmp, .rvtstate, .rvtbackup

  • The most common file extension in Revit is .rvt, which is used for project files

  • .rfa is used for family files, which contain individual building components

  • .rte is used for template files, which provi...read more

Q2. Model a I-Beam and a set of piles, pile caps, pier and pier cap in revit?

Ans.

To model an I-Beam and a set of piles, pile caps, pier and pier cap in Revit, follow these steps:

  • Create a new project and set the units to the desired scale.

  • Use the Structural Framing tool to create the I-Beam.

  • Use the Structural Foundation tool to create the piles, pile caps, pier, and pier cap.

  • Add dimensions and annotations to the model as needed.

  • Save the model and export it in the desired format.

Q3. Lap length in reinforcement detailing?

Ans.

Lap length is the amount of overlap between two reinforcing bars in a concrete structure.

  • Lap length is determined by the diameter of the bars and the strength of the concrete.

  • It is important to follow the lap length requirements to ensure the structural integrity of the building.

  • Lap length can vary depending on the type of reinforcement used and the specific design of the structure.

  • For example, lap length for tension bars is typically longer than for compression bars.

  • Lap leng...read more

Q4. Reinforcement placing in a pile?

Ans.

Reinforcement placing in a pile involves placing steel bars or cages inside a drilled hole before pouring concrete.

  • Reinforcement is placed in a pile to increase its strength and stability.

  • The size and spacing of the reinforcement bars are determined by the design requirements.

  • The reinforcement is usually placed in a cage or bundle and lowered into the drilled hole.

  • The cage or bundle is then secured in place and the concrete is poured around it.

  • Proper placement of reinforcemen...read more

Bim Technician Jobs

BIM Technician - Fire & Life Safety 5-7 years
WSP
4.2
Bangalore / Bengaluru
BIM Technician - Structures 2-7 years
WSP Consultants India Ltd
4.2
Bangalore / Bengaluru
BIM Technician - Structures 10-15 years
WSP
4.2
Bangalore / Bengaluru
Are these interview questions helpful?
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Bim Technician Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter