I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
About maintenance field
I was interviewed before Nov 2016.
Top trending discussions
posted on 20 Nov 2024
AFR stands for Accident Frequency Rate, a measure used to calculate the frequency of accidents in a workplace.
AFR is calculated by dividing the total number of accidents by the total number of hours worked, multiplied by 1,000,000.
It helps in determining the safety performance of a workplace and identifying areas for improvement.
For example, if a company had 10 accidents in a year and employees worked a total of 100,00...
SWL (Safe Working Load) can be calculated by dividing the breaking strength of a material by a safety factor.
SWL = Breaking Strength / Safety Factor
Breaking Strength is the maximum load a material can withstand before failure
Safety Factor is a multiplier applied to the breaking strength to ensure safety
Example: If a rope has a breaking strength of 10,000 lbs and a safety factor of 5, SWL = 10,000 / 5 = 2,000 lbs
posted on 15 Jun 2024
Shear key is a device used to transfer shear forces between two components in a structure.
Shear keys are typically used in construction joints to prevent sliding between adjacent components.
They are designed to resist horizontal forces and ensure stability of the structure.
Shear keys can be found in various structures such as bridges, buildings, and dams.
Examples of shear key materials include steel plates, dowel bars,
Columns are vertical structural members that support loads primarily in compression, while beams are horizontal structural members that support loads primarily in bending.
Columns support vertical loads primarily in compression
Beams support horizontal loads primarily in bending
Columns are typically taller than beams
Columns are usually more rigid than beams
Examples: In a building, columns support the weight of the floors
posted on 30 Sep 2022
I applied via Approached by Company and was interviewed in Aug 2022. There were 5 interview rounds.
The wastage percentages of construction materials vary depending on the type of material and the project requirements.
Wastage percentages can range from 2-5% for cement and steel to 10-15% for bricks and tiles.
Factors that affect wastage include the skill level of workers, the quality of materials, and the complexity of the project.
Proper planning and management can help minimize wastage and reduce project costs.
Regula...
Rolling margin of steel is the difference between the cost of producing steel and the selling price.
It is a measure of profitability for steel manufacturers.
It is calculated by subtracting the cost of production from the selling price.
A higher rolling margin indicates higher profitability.
Factors that affect rolling margin include raw material costs, energy costs, and market demand.
Worker and machinery productivity are crucial for effective planning.
Worker productivity can be measured by the amount of work completed in a given time period.
Machinery productivity can be measured by the amount of output produced by the machinery in a given time period.
Both worker and machinery productivity should be taken into account when planning to ensure efficient use of resources.
For example, if workers are mor...
Deductions in client bill include taxes, discounts, late fees, and service charges.
Taxes: Sales tax, VAT, GST, etc.
Discounts: Promotions, loyalty rewards, bulk discounts, etc.
Late fees: Charges for overdue payments.
Service charges: Fees for additional services provided.
Retention and TDS are important factors to consider in subcontractor billing.
Retention refers to the amount of money withheld by the client as a form of security against any defects or issues that may arise after the project is completed.
TDS (Tax Deducted at Source) is the tax deducted by the client from the subcontractor's payment and deposited with the government.
Both retention and TDS should be clearly mentioned in ...
posted on 6 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
The required compaction for dry lean concrete is specified by MORTH.
MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.
The compaction factor for dry lean concrete should be between 0.78 to 0.82.
The compaction should be done using a plate vibrator or a needle vibrator.
The required compaction can vary depending on the type of dry lean concrete being used.
Proper compaction is import...
The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.
Traffic load and volume
Subgrade soil conditions
Climate and weather conditions
Concrete mix design
Joint spacing and layout
The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.
The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.
The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.
The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and ...
The slope in normal camber varies depending on the design and purpose of the structure.
Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.
The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.
For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic...
The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.
The quantity of prime coat depends on the type of bitumen extractor machine used
It is important to follow the manufacturer's instructions for the specific machine being used
Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed
Typically, the quantity of pri...
The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.
The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.
The type of bitumen extractor machine used can affect the quantity of tack coat used.
The thickness of the GSB layer can also impact the quantity of tack coat used.
W...
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 2 May 2022
based on 2 interviews
Interview experience
based on 141 reviews
Rating in categories
Project Manager
6
salaries
| ₹9 L/yr - ₹12.1 L/yr |
Graduate Engineer Trainee (Get)
6
salaries
| ₹1.2 L/yr - ₹2.4 L/yr |
Senior Accountant
5
salaries
| ₹2.7 L/yr - ₹3.6 L/yr |
QA QC Engineer
5
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Junior Officer
5
salaries
| ₹1.8 L/yr - ₹1.8 L/yr |
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited
Punj Lloyd