FIDIC is a standard form of contract used in the construction industry, covering compliance, delay events, and relevant articles.
FIDIC stands for International Federation of Consulting Engineers
It provides a framework for construction contracts, including compliance requirements and procedures for handling delay events
Key articles in FIDIC contracts include those related to variations, claims, and dispute resolution
I h...
posted on 6 Sep 2022
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I applied via campus placement at Indian Institute of Technology (IIT), Mumbai and was interviewed in Dec 2023. There was 1 interview round.
Uniform loading refers to distributing a load evenly across a surface or structure.
Uniform loading helps prevent stress concentrations and ensures stability.
It is commonly used in engineering and construction to ensure the safety and integrity of structures.
Examples include evenly distributed weight on a shelf or uniform pressure on a bridge.
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
Earned value analysis is a project management technique used to measure project performance and progress.
Compares actual work completed and costs incurred to planned work and costs
Helps identify project variances and forecast project outcomes
Uses metrics such as planned value, earned value, and actual cost
Provides insight into project schedule and budget performance
Can be used to make data-driven decisions and adjustme
posted on 25 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
posted on 6 May 2022
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
Project Manager
6
salaries
| ₹9 L/yr - ₹12.1 L/yr |
Graduate Engineer Trainee (Get)
6
salaries
| ₹1.2 L/yr - ₹2.4 L/yr |
Senior Accountant
5
salaries
| ₹2.7 L/yr - ₹3.6 L/yr |
QA QC Engineer
5
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Junior Officer
5
salaries
| ₹1.8 L/yr - ₹1.8 L/yr |
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited
Punj Lloyd