I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION
Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.
The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.
The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.
The Sun is the central star of our solar system, p...
I applied via Referral
Top trending discussions
posted on 11 Feb 2021
I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.
Cube mould size is a standard size used for testing the compressive strength of concrete.
Cube moulds are typically made of steel or cast iron.
The standard size for cube moulds is 150mm x 150mm x 150mm.
Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.
The moulds are filled with concrete and left to cure before being tested for compressive strength.
Cube moulds are used to ensure that the c...
To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.
Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length
Find the density of steel, which is typically around 7850 kg/m^3
Multiply the volume by the density to get the weight of the rod
posted on 7 Sep 2022
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 25 Jun 2021
I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.
The process of tower foundation involves several steps that are carried out day by day.
Day 1: Site preparation and layout survey
Day 2: Excavation for foundation
Day 3: Reinforcement placement
Day 4: Formwork installation
Day 5: Concrete pouring
Day 6: Curing of concrete
Day 7: Removal of formwork
Day 8: Quality inspection and testing
Day 9: Backfilling around the foundation
Day 10: Final inspection and documentation
Cube mould size refers to the dimensions of the mould used to cast concrete cubes for testing.
Cube moulds are typically made of steel or cast iron.
The most common cube mould size used in construction is 150mm x 150mm x 150mm.
Other sizes like 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used depending on the requirements.
Cube moulds have removable base plates to facilitate easy removal of the hardened conc...
Quality points at the pouring time of concrete include proper mix proportions, correct placement, adequate compaction, and appropriate curing.
Proper mix proportions ensure the desired strength and durability of the concrete.
Correct placement involves placing the concrete in the designated location without segregation or excessive bleeding.
Adequate compaction ensures that there are no voids or air pockets in the concret...
Sloped cutting refers to the excavation of soil or rock at an inclined angle to create a slope or incline.
Sloped cutting is commonly used in construction projects to create roadways, railways, or canals on hilly terrains.
It involves removing the excess material from a higher elevation to a lower elevation, forming a sloping surface.
The angle of the slope is determined based on factors such as soil stability, desired gr...
posted on 16 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
posted on 24 May 2024
I applied via Job Fair and was interviewed before May 2023. There was 1 interview round.
posted on 8 May 2024
I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.
The standard dimensions of a brick are 3 5/8 inches x 2 1/4 inches x 8 inches.
Standard brick size is 3 5/8 inches x 2 1/4 inches x 8 inches
Bricks can also come in different sizes based on region or purpose
Common brick sizes include modular, jumbo, and queen
The water-cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
It is a crucial factor in determining the strength and durability of concrete.
A lower water-cement ratio results in stronger and more durable concrete.
The typical range for water-cement ratio is between 0.4 to 0.6.
Excessive water in the mix can lead to lower strength and durability of concrete.
Heat of hydration is the heat released when water is added to cement during the chemical reaction of hydration.
Heat of hydration is the heat released when water is added to cement during the chemical reaction of hydration.
It is an exothermic reaction, meaning it releases heat.
The heat of hydration is important to consider in concrete construction to prevent cracking and ensure proper curing.
Higher heat of hydration can...
Curing is the process of maintaining adequate moisture and temperature in concrete to ensure proper hydration and strength development.
Curing helps prevent cracking and ensures the concrete reaches its full strength potential.
Common curing methods include water curing, membrane curing, and curing compounds.
Proper curing typically lasts for at least 7 days, but can vary depending on the type of concrete mix and environm
Footing is the bottommost part of a foundation that distributes the load of the structure to the soil.
Footing is typically made of concrete and is wider than the foundation walls to provide stability.
Foundations are the lower portion of a building structure that transfers the load to the soil.
There are different types of foundations such as shallow foundations (like spread footings) and deep foundations (like piles).
One way slab is supported on two opposite sides while two way slab is supported on all four sides.
One way slab is designed to carry loads along one direction only
Two way slab is designed to carry loads along both directions
One way slab is supported on two opposite sides
Two way slab is supported on all four sides
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Electrical Engineer
270
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
246
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
235
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
165
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
137
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Power
Thermax Limited
BHEL