I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - I want to growth more good communication skills

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Technical 

(1 Question)

  • Q1. Will ask Technical Questions Related to Projects.
Round 2 - HR 

(1 Question)

  • Q1. Will ask about past companies experience and role, responsibility etc.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Foundation installation process is oil and gas industry
  • Ans. Explain it as required as per industry requirement like Valid Permit, Valid lifting plan, Approved method statement, barrication,Sign boards, banks man, competent and certified equipment and operator, rigger, color coded and inspected lifting accessories, check wind speed limits, foggy or dusty weather conditions
  • Answered Anonymously
  • Q2. Excavation process for oil and gas industry
  • Ans. 

    Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.

    • The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.

    • Before excavation begins, proper permits and approvals must be obtained from relevant authorities.

    • Excavation equipment such as excavators, bulldozers, and ba...

  • Answered by AI
  • Q3. Valid Permit, approved method statement, Excavation certificate, check GPR (Ground penetrating radar)report, CAT (Cable avoidance Tool) Scan, Drawing, route marker, Trial pit, hard barricade the area, cert...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as per your resume and for the post you apply for
If possible then Do some research about company and project that you apply for
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Basic technical
  • Q2. Grad of concrete , cement,sand , compaction
  • Ans. 

    The gradation of concrete refers to the proportions of cement, sand, and aggregate used in the mixture, while compaction is the process of reducing air voids in the concrete.

    • The gradation of concrete is determined by the desired strength and workability of the mixture.

    • Common gradations include 1:2:4 (cement:sand:aggregate) for general use and 1:1.5:3 for reinforced concrete.

    • Compaction is achieved through the use of mec...

  • Answered by AI
  • Q3. Measurement , Grad of concrete, sand density

Interview Preparation Tips

Topics to prepare for PES Engineers Civil Engineer interview:
  • Cement,sand
Interview preparation tips for other job seekers - Perfect your privious experience questions

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Bbs, shuttering, leveling, testing, quality.

Interview Preparation Tips

Interview preparation tips for other job seekers - Project monitoring, Project management, client management, project development, staff development skills

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.

I was interviewed in Mar 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All the basics of civil ingeering

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a good attitude and sound Basics knowledge of engineering
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Hard work,.road line..pipe line.. others
  • Q2. Hard work.. road line..pipe line..others
  • Q3. Hard work..road line
Round 2 - Assignment 

Hard work and pipeline roadlines work...

Round 3 - Civil foreman 

(4 Questions)

  • Q1. Hard work..road line pipe line
  • Ans. 

    All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage

  • Answered Anonymously
  • Q2. Hard work..road line pipe line work
  • Q3. Hard work..road line pipe line work ...
  • Q4. Hard work pipe line work
Round 4 - Assignment 

Hard work and pipeline roadlines work..

Round 5 - Technical 

(15 Questions)

  • Q1. Hard work and pipeline roadlines
  • Q2. Hard work and pipeline ..roadlines
  • Q3. Hard work and pipeline roadlines work.
  • Q4. Hard work and pipeline roadlines work..
  • Q5. JCB work road line pipe..
  • Q6. Hard work and pipeline ..roadlines work..
  • Q7. Hard work.. pipe line work..
  • Q8. Hard work and pipeline roadlines ok
  • Q9. Civil foreman complete documents and..
  • Q10. Hard work and JCB work road line pipe line..
  • Q11. Road line pipe line.
  • Q12. Hard work pipe line pipe line
  • Q13. Hard work pipe line..
  • Q14. Hard work road line..
  • Q15. JCB work road line..
Round 6 - Coding Test 

Hard work and pipeline roadlines work..

Round 7 - Coding Test 

Hard work and pipeline roadlines

Interview Preparation Tips

Topics to prepare for Archirodon Civil Foreman interview:
  • Civil foreman
  • Graduate
Interview preparation tips for other job seekers - Civil foreman complete documents and please let me

SRR Projects Interview FAQs

How many rounds are there in SRR Projects B Tech Civil Engineer interview?
SRR Projects interview process usually has 2 rounds. The most common rounds in the SRR Projects interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 698 Interviews
Tata Projects Interview Questions
4.3
 • 402 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Eversendai Interview Questions
3.8
 • 27 Interviews
View all
Senior Engineer
27 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Site Engineer
16 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Civil Site Engineer
14 salaries
unlock blur

₹2.4 L/yr - ₹5.9 L/yr

Junior Engineer Civil
13 salaries
unlock blur

₹2.1 L/yr - ₹3.2 L/yr

Civil Engineer
12 salaries
unlock blur

₹2.5 L/yr - ₹5.2 L/yr

Explore more salaries
Compare SRR Projects with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview