Filter interviews by
Top trending discussions
posted on 12 Nov 2024
I applied via Recruitment Consulltant
posted on 16 Apr 2024
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.
The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.
Before excavation begins, proper permits and approvals must be obtained from relevant authorities.
Excavation equipment such as excavators, bulldozers, and ba...
I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.
The gradation of concrete refers to the proportions of cement, sand, and aggregate used in the mixture, while compaction is the process of reducing air voids in the concrete.
The gradation of concrete is determined by the desired strength and workability of the mixture.
Common gradations include 1:2:4 (cement:sand:aggregate) for general use and 1:1.5:3 for reinforced concrete.
Compaction is achieved through the use of mec...
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
posted on 14 Sep 2022
I was interviewed in Mar 2022.
I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.
Hard work and pipeline roadlines work...
All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Senior Engineer
27
salaries
| ₹3 L/yr - ₹8 L/yr |
Site Engineer
16
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Civil Site Engineer
14
salaries
| ₹2.4 L/yr - ₹5.9 L/yr |
Junior Engineer Civil
13
salaries
| ₹2.1 L/yr - ₹3.2 L/yr |
Civil Engineer
12
salaries
| ₹2.5 L/yr - ₹5.2 L/yr |
L&T Construction
Tata Projects
Hindustan Construction Company
GAMMON INDIA