i
Spark Minda
Filter interviews by
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced production engineer
Skilled in optimizing manufacturing processes
Ensuring efficient production
Strong knowledge of production equipment and technologies
Proficient in analyzing data and implementing improvements
Collaborative team player
I was a Senior Production Engineer in my previous company.
I held the position of Senior Production Engineer.
I was responsible for overseeing production processes and ensuring efficiency.
I worked closely with the production team to identify and resolve any issues.
I implemented improvements to optimize production output and reduce costs.
I collaborated with other departments to coordinate production schedules and meet dea...
As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.
Overseeing the manufacturing process
Optimizing production efficiency
Ensuring quality control
Identifying and resolving production issues
Implementing process improvements
Collaborating with cross-functional teams
Monitoring production metrics and analyzing data
Creating and maintaining produc
DFT in painting stands for Dry Film Thickness.
DFT is the thickness of the paint film after it has dried.
It is measured using a coating thickness gauge.
The DFT is important for ensuring proper protection and appearance of the painted surface.
For example, a coating may require a minimum DFT of 2 mils to provide adequate corrosion protection.
DFT can also affect the drying time and curing of the paint.
Dry film thickness refers to the thickness of a coating after it has dried and cured.
It is measured using a coating thickness gauge.
It is important to ensure that the dry film thickness meets the specifications for the coating.
The dry film thickness can affect the performance and durability of the coating.
Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.
Dry film t...
Excess DFT can lead to increased cost and longer production time.
Excess DFT can lead to increased material usage and waste.
It can also lead to longer production time and increased cost.
The excess DFT may also affect the performance and durability of the product.
It is important to ensure that the DFT is within the specified range to avoid these issues.
I applied via campus placement at Kalinga Institute of Industrial Technology, Khurda and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Oct 2022. There were 3 interview rounds.
Overall Equipment Effectiveness (OEE) is a measure of how effectively equipment is being utilized to produce quality products.
OEE is calculated by multiplying availability, performance, and quality rates.
Availability rate measures the percentage of time the equipment is available for production.
Performance rate measures the speed at which the equipment is producing products compared to its maximum capacity.
Quality rate...
Improved production efficiency by implementing new processes and reducing downtime.
Implemented a new scheduling system that reduced production downtime by 20%
Developed and implemented a preventive maintenance program that reduced equipment breakdowns by 15%
Led a team in optimizing production line layout, resulting in a 10% increase in overall efficiency
Streamlined inventory management processes, reducing waste and impr...
High pressure die casting is a metal casting process in which molten metal is injected into a mold cavity under high pressure.
Molten metal is injected into a mold cavity under high pressure
The mold is made of two halves and is designed to create a specific shape
The process is used to create complex shapes with high accuracy and surface finish
Commonly used for manufacturing automotive parts, aerospace components, and co
Cycle time is the time taken to complete a task while takt time is the time available to complete a task.
Cycle time is the total time taken to complete a process, including both processing and waiting time.
Takt time is the rate at which a product must be produced to meet customer demand.
Cycle time should be less than or equal to takt time to meet customer demand.
For example, if a company has a takt time of 60 seconds a...
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired my interest in the field.
I have two siblings, one of whom is a doctor, which has given me exposure to the medical field.
My grandparents were farmers, teaching me the importance of hard work and problem-solving.
My family has always encouraged education and supported my career aspirations.
Spark Minda interview questions for designations
I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.
All types Of questions
Get interview-ready with Top Spark Minda Interview Questions
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Thermoplastics can be melted and reshaped multiple times, while thermosets undergo a chemical reaction during curing and cannot be reshaped.
Thermoplastics can be melted and reshaped multiple times, while thermosets undergo a chemical reaction during curing and cannot be reshaped.
Thermoplastics are typically used in products like plastic bags, bottles, and toys, while thermosets are used in products like car tires, elec...
Glass filled polymer is a composite material made by mixing glass fibers with a polymer resin, resulting in a stronger and more durable material.
Glass filled polymers have improved strength, stiffness, and heat resistance compared to regular polymers.
They are commonly used in automotive parts, electronic housings, and industrial components.
Examples include glass filled nylon, glass filled polypropylene, and glass fille
Types of defects in parts and troubleshooting methods
Types of defects: dimensional inaccuracies, surface imperfections, material flaws, assembly errors
Troubleshooting methods: conducting inspections, using measurement tools, adjusting manufacturing processes
Example: Dimensional inaccuracies can be troubleshooted by calibrating machines and tools
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
Top trending discussions
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and manufacturing processes
Implemented lean manufacturing principles to improve efficiency
Led cross-functional teams to troubleshoot production issues
posted on 28 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
based on 35 reviews
Rating in categories
Assistant Manager
352
salaries
| ₹4.5 L/yr - ₹14.4 L/yr |
Senior Engineer
229
salaries
| ₹2.2 L/yr - ₹10 L/yr |
Deputy Manager
226
salaries
| ₹7 L/yr - ₹22.5 L/yr |
Quality Engineer
223
salaries
| ₹1.2 L/yr - ₹5.7 L/yr |
Engineer
175
salaries
| ₹2.2 L/yr - ₹6.2 L/yr |
Bharat Forge
Samvardhana Motherson Group
Endurance Technologies
Rane Group