I have experience in implementing various techniques for vibration and noise reduction in industrial settings.
I have worked on installing vibration dampers on machinery to reduce noise levels.
I have also implemented sound-absorbing materials in factories to reduce noise pollution.
I have experience in conducting noise level measurements and analysis to identify areas of improvement.
I have worked on designing and impleme...
I applied via Naukri.com and was interviewed before Apr 2021. There were 5 interview rounds.
Sonalika Tractors interview questions for designations
I applied via Company Website and was interviewed before Aug 2019. There were 4 interview rounds.
Top trending discussions
I was interviewed in Jan 2025.
At plant level discussion with plant head and dept head regarding training to the blue collar employees, skill matrix, training evaluation and regarding my past experience.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 3 interview rounds.
In my current role, I am responsible for overseeing daily operations, managing a team, and ensuring targets are met.
Managing and supervising a team of employees
Setting and achieving performance targets
Developing and implementing strategies to improve efficiency
Handling customer complaints and resolving issues
Training and mentoring staff members
Preparing reports and presenting findings to senior management
Some of the latest technologies available in air washers include IoT integration, HEPA filters, and UV-C light disinfection.
IoT integration for remote monitoring and control
HEPA filters for capturing small particles and allergens
UV-C light disinfection for killing bacteria and viruses
Requirements for setting up a new plant include location selection, obtaining permits, securing funding, hiring staff, and purchasing equipment.
Location selection based on factors like proximity to suppliers and target market
Obtaining permits and meeting regulatory requirements
Securing funding through loans, investors, or grants
Hiring staff with the necessary skills and expertise
Purchasing equipment and setting up infr...
Yes, I have experience in setting up new production lines and plants.
Led the setup of a new production line at my previous company, overseeing equipment installation and staff training
Implemented efficient processes to ensure smooth transition and minimal downtime during the setup phase
Collaborated with cross-functional teams to coordinate logistics and ensure timely completion of the project
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for career growth and new experiences.
I have relocated for previous job opportunities and have adapted well to new environments.
I understand the importance of being flexible and willing to move for the right role.
posted on 12 Aug 2023
I applied via Walk-in and was interviewed before Aug 2022. There were 3 interview rounds.
Some of the top questions asked at the Sonalika Tractors Deputy Manager interview -
based on 3 interviews
2 Interview rounds
based on 92 reviews
Rating in categories
Assistant Manager
852
salaries
| ₹2.5 L/yr - ₹10.5 L/yr |
Senior Engineer
515
salaries
| ₹2.2 L/yr - ₹7.1 L/yr |
Deputy Manager
435
salaries
| ₹4.7 L/yr - ₹14 L/yr |
Engineer
363
salaries
| ₹1.8 L/yr - ₹5.1 L/yr |
Manager
232
salaries
| ₹7 L/yr - ₹21 L/yr |
Mahindra & Mahindra
Tractors and Farm Equipment
John Deere
Escorts Kubota Limited