I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.
Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.
Develop project schedules using software like Primavera P6
Monitor project progress and identify potential delays
Coordinate with various teams to ensure timely completion
Prepare reports on project status and communicate with stakeholders
Implement changes to the schedule as needed to keep the project on
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the shortest possible duration for completing the project.
Any delay in tasks on the critical path will directly impact the project's overall timeline.
Activities on the critical path have ...
Density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel is approximately 7.85 g/cm^3.
Different types of steel may have slightly different densities.
Weight of steel can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel (length x width x height)
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight
Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg
Number of tiles can be calculated by determining the area to be covered and the size of each tile.
Calculate the total area to be covered by multiplying the length and width of the space.
Determine the size of each tile in square units.
Divide the total area by the size of each tile to get the number of tiles needed.
Consider adding extra tiles for cuts and wastage.
For example, if a room is 10 feet by 12 feet and each tile
I applied via LinkedIn and was interviewed in Jul 2021. There were 5 interview rounds.
I appeared for an interview before Sep 2021.
Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify available resources and constraints
Create a detailed project schedule
Monitor progress and make adjustments as necessary
The planning process involves identifying objectives, determining resources, and creating a timeline for completion.
Identify project objectives and goals
Determine available resources and constraints
Create a detailed project plan with timelines and milestones
Monitor progress and make adjustments as necessary
Communicate with stakeholders and team members throughout the process
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.
Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.
Concrete is a composite material made up of cement, water, aggregates, and often other additives.
It is widely used in construction for its strength, durability, and versatility.
Concrete technology involves understanding the chemical reactions and physical properties of concrete.
It includes...
My favorite subject is computer science.
I enjoy studying algorithms and data structures.
I find programming languages fascinating and love exploring their features.
I am passionate about software development and enjoy solving complex problems.
I am interested in artificial intelligence and machine learning.
I enjoy learning about computer networks and cybersecurity.
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
I appeared for an interview before Feb 2024.
I appeared for an interview in Feb 2023.
Self introduction, previous experience of working.
Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.
Shear force diagram is a graph of shear force plotted against the length of the beam.
Bending moment diagram is a graph of bending moment plotted against the length of the beam.
Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...
Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.
Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.
It includes factors such as type of material, dimensions, quality standards, and wastage allowances.
For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring new opportunities for career advancement.
Seeking a company with a better cultural fit or work-life balance.
Want to work on more innovative projects or in a different industry.
Previous company downsized or restructured, leading to job loss.
I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.
Implemented best practices in engineering processes and project management
Fostered a culture of continuous improvement through regular training and feedback sessions
Ensured alignment with industry standards and certifications such as ISO, ASME, or API
Regul...
based on 1 interview
Interview experience
based on 21 reviews
Rating in categories
Senior Engineer
501
salaries
| ₹2.8 L/yr - ₹6.2 L/yr |
Project Engineer
462
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Assistant Manager
325
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Deputy Manager
209
salaries
| ₹5 L/yr - ₹11 L/yr |
Senior Executive
201
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Godrej Properties
DLF
Surya Roshni
Emaar India Limited