TDS stands for Tax Deducted at Source. It is the amount deducted by a payer at the time of making payment to the payee.
TDS is deducted by the payer and deposited with the government on behalf of the payee.
The percentage of TDS varies depending on the type of payment and the applicable tax laws.
For example, the TDS rate on salary income is different from the TDS rate on interest income.
TDS ensures that the government re...
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
Painal mcb rccb atometic cangar
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
Initial setting time is the time when the concrete starts to harden, while final setting time is when it is completely hardened.
Initial setting time typically ranges from 30 minutes to 1.5 hours.
Final setting time is usually around 6 to 10 hours.
Factors affecting setting time include temperature, cement type, water-cement ratio, and admixtures.
Example: A rapid-setting concrete may have an initial setting time of 5 minu
Specific gravity of coarse aggregate is typically between 2.6 to 2.9.
Specific gravity is the ratio of the weight of a given volume of aggregate to the weight of an equal volume of water.
It is an important parameter in concrete mix design as it helps in determining the weight of aggregate required for a given volume of concrete.
The specific gravity of coarse aggregate used in concrete typically ranges from 2.6 to 2.9.
Hi...
The consumption of bricks per cubic meter of masonry wall varies depending on the type of bricks and the thickness of the wall.
The consumption of bricks for a solid brick wall will be different from a cavity wall.
The size and type of bricks used will also impact the consumption rate.
Generally, for solid brick walls, the consumption can range from 500 to 700 bricks per cubic meter.
For cavity walls, the consumption can b...
Sobha Engineering Contracting interview questions for popular designations
I applied via Walk-in and was interviewed in Mar 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.
Easy
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 5 interview rounds.
I would investigate the root cause of the unstable slump and take corrective actions.
Check the concrete mix design and adjust if necessary
Verify the calibration of the slump cone and test equipment
Inspect the batching and mixing process for errors
Consult with concrete supplier and adjust delivery schedule
Notify project management and stakeholders of delays
Ensure proper disposal of rejected concrete
Implement preventive
An Inspection Test Plan for slab construction should include detailed procedures for inspection and testing of materials and workmanship.
Identification of materials and their sources
Inspection of formwork and reinforcement
Testing of concrete mix design and slump
Inspection of concrete placement and finishing
Testing of concrete strength
Inspection of curing methods
Final inspection of completed slab
The ITP for taking over a shell and core floor for final finishing and fitout would involve a thorough inspection and testing process.
Conduct a detailed inspection of the shell and core floor to identify any defects or issues that need to be addressed before final finishing and fitout can begin
Develop a comprehensive testing plan to ensure that all systems and components are functioning properly and meet the required s...
Top trending discussions
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
posted on 20 Feb 2015
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
Some of the top questions asked at the Sobha Engineering Contracting interview -
based on 4 interviews
Interview experience
based on 86 reviews
Rating in categories
Senior Engineer
10
salaries
| ₹3.6 L/yr - ₹4.5 L/yr |
Assistant Manager
6
salaries
| ₹5.8 L/yr - ₹10.2 L/yr |
Planning Engineer
5
salaries
| ₹4.1 L/yr - ₹30 L/yr |
Senior Planning Engineer
4
salaries
| ₹4.7 L/yr - ₹36 L/yr |
Quantity Surveyor
4
salaries
| ₹3.1 L/yr - ₹20 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures