Q1. What would you do when 3 or 4 loads of concrete is rejected due to unstable slump?

Ans.

I would investigate the root cause of the unstable slump and take corrective actions.

  • Check the concrete mix design and adjust if necessary

  • Verify the calibration of the slump cone and test equipment

  • Inspect the batching and mixing process for errors

  • Consult with concrete supplier and adjust delivery schedule

  • Notify project management and stakeholders of delays

  • Ensure proper disposal of rejected concrete

  • Implement preventive measures to avoid future rejections

Add your answer

Q2. what would be your ITP to take over a shell and core floor for final finishing and fitout

Ans.

The ITP for taking over a shell and core floor for final finishing and fitout would involve a thorough inspection and testing process.

  • Conduct a detailed inspection of the shell and core floor to identify any defects or issues that need to be addressed before final finishing and fitout can begin

  • Develop a comprehensive testing plan to ensure that all systems and components are functioning properly and meet the required standards

  • Establish clear communication channels with all st...read more

Add your answer

Q3. Specific gravity of coarse aggregateusing for concrete ?

Ans.

Specific gravity of coarse aggregate is typically between 2.6 to 2.9.

  • Specific gravity is the ratio of the weight of a given volume of aggregate to the weight of an equal volume of water.

  • It is an important parameter in concrete mix design as it helps in determining the weight of aggregate required for a given volume of concrete.

  • The specific gravity of coarse aggregate used in concrete typically ranges from 2.6 to 2.9.

  • Higher specific gravity indicates denser and stronger aggreg...read more

Add your answer

Q4. Consumption of bricks per cubic menter of masonry wall ?

Ans.

The consumption of bricks per cubic meter of masonry wall varies depending on the type of bricks and the thickness of the wall.

  • The consumption of bricks for a solid brick wall will be different from a cavity wall.

  • The size and type of bricks used will also impact the consumption rate.

  • Generally, for solid brick walls, the consumption can range from 500 to 700 bricks per cubic meter.

  • For cavity walls, the consumption can be lower, around 300 to 400 bricks per cubic meter.

Add your answer
Discover Abb Management Services interview dos and don'ts from real experiences

Q5. Initial & Final setting time of concrete ?

Ans.

Initial setting time is the time when the concrete starts to harden, while final setting time is when it is completely hardened.

  • Initial setting time typically ranges from 30 minutes to 1.5 hours.

  • Final setting time is usually around 6 to 10 hours.

  • Factors affecting setting time include temperature, cement type, water-cement ratio, and admixtures.

  • Example: A rapid-setting concrete may have an initial setting time of 5 minutes and a final setting time of 30 minutes.

Add your answer

Q6. structure of Inspection Test Plan for slab construction

Ans.

An Inspection Test Plan for slab construction should include detailed procedures for inspection and testing of materials and workmanship.

  • Identification of materials and their sources

  • Inspection of formwork and reinforcement

  • Testing of concrete mix design and slump

  • Inspection of concrete placement and finishing

  • Testing of concrete strength

  • Inspection of curing methods

  • Final inspection of completed slab

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Abb Management Services

based on 3 interviews in the last 1 year
Interview experience
4.3
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 2.8k Interview Questions
3.8
 • 359 Interview Questions
4.2
 • 268 Interview Questions
3.2
 • 161 Interview Questions
4.1
 • 154 Interview Questions
3.6
 • 132 Interview Questions
View all
Top Sobha Engineering Contracting Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter