I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
Rate analysis of BOQ items involves calculating the rates of various items in the Bill of Quantities.
Rate analysis involves determining the cost of materials, labor, and equipment for each item in the BOQ.
It helps in estimating the total cost of a project and comparing it with the budget.
Factors like market rates, location, and project specifications are considered in rate analysis.
Example: Calculating the rate of conc...
Standard output of Machinery refers to the expected production rate or quantity of goods produced by a machine in a given time period.
Standard output is determined by the capacity and efficiency of the machinery.
Factors affecting standard output include machine speed, maintenance, and operator skill.
Examples of standard output measurements include units per hour, tons per day, or meters per minute.
Top trending discussions
posted on 2 Jun 2021
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I appeared for an interview in Oct 2022.
WBS stands for Work Breakdown Structure, which is a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS for a highway project would include major components like earthwork, pavement, drainage, signage, lighting, etc.
WBS for a structure project would include components like foundation, superstructure, finishes, MEP (mechanical, electrical, plumbing), etc.
Each major component i...
posted on 5 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
30 Marks Technical related to Works and Codes (Depends upon department)
The sequence of planning involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify resources needed for the project
Create a detailed schedule outlining tasks and milestones
Allocate resources effectively to meet project deadlines
Monitor progress and make adjustments as needed
Project deliverables are the tangible outcomes or results that must be produced to complete a project.
They are specific, measurable, and usually time-bound.
Examples include reports, prototypes, software, buildings, or any other tangible product or result.
Deliverables help to define the scope of the project and provide a clear target for the project team.
Labour outputs refer to the amount of work completed by a laborer within a specific time frame.
Labour outputs are typically measured in units of work completed, such as square meters of concrete poured or number of bricks laid.
They are influenced by factors such as skill level of the laborer, availability of tools and equipment, and working conditions.
Monitoring and analyzing labour outputs can help in assessing produc...
Key responsibilities include creating project schedules, monitoring progress, identifying delays, and providing recommendations for improvement.
Creating and maintaining project schedules using software like Primavera P6
Monitoring project progress and identifying potential delays
Analyzing project data to provide recommendations for improvement
Collaborating with project team members to ensure schedule adherence
Preparing ...
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
20 question of Apti and 30 questions of Technical, timing 1 hr
posted on 28 Sep 2022
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
posted on 1 Nov 2022
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
Aptitude tests your technical knowledge based on college education.
I applied via Campus Placement
The test was based on logical reasoning and verbal reasoning.
EVM stands for Earned Value Management. It is a project management technique used to measure project performance and progress.
EVM integrates scope, schedule, and cost to provide a comprehensive view of project performance.
It compares the planned value (PV), earned value (EV), and actual cost (AC) to assess project health.
PV represents the budgeted cost of the work scheduled, EV represents the budgeted cost of the work ...
posted on 30 Sep 2024
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
Inch Dia and Inch Meter are units of measurement used in engineering for pipe sizes and lengths.
Inch Dia refers to the diameter of a pipe in inches
Inch Meter refers to the length of a pipe in meters
They are commonly used in piping and construction projects
Estimate the quantity of cement and sand needed for a boundary wall construction project.
Calculate the volume of the boundary wall in cubic meters
Determine the mix ratio of cement and sand for the project
Use the mix ratio to calculate the quantity of cement and sand needed
Consider wastage and spillage when estimating quantities
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Executive Accountant
11
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Accounts Executive
11
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Assistant Manager
10
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Structural Engineer
9
salaries
| ₹3.8 L/yr - ₹6.6 L/yr |
Store Executive
8
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies