i
Filter interviews by
I applied via Approached by Company and was interviewed before Oct 2021. There were 4 interview rounds.
Effective project planning and management is critical to cost optimization in construction.
Develop a detailed project plan with clear timelines and milestones
Regularly monitor and track project progress to identify potential cost overruns
Implement cost-saving measures such as value engineering and lean construction
Collaborate closely with suppliers and subcontractors to negotiate favorable pricing
Ensure effective commu...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
Stator winding process involves winding copper wire around the stator core to create an electromagnetic field.
The stator core is made up of laminated steel sheets to reduce eddy current losses.
The copper wire used for winding is insulated to prevent short circuits.
The winding process can be done manually or by using automated machines.
The number of turns and wire gauge used for winding depends on the design specificati...
I applied via Company Website and was interviewed in Sep 2021. There were 2 interview rounds.
Work experience in compeny and my best working Sumit work... Assembly
Siemens Gamesa Renewable Power Private Limited interview questions for popular designations
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
Get interview-ready with Top Siemens Gamesa Renewable Power Private Limited Interview Questions
I was interviewed before Mar 2021.
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
Ground mounting work refers to the installation of solar panels or other structures on the ground.
Ground mounting work involves preparing the site for installation, including clearing vegetation and leveling the ground.
It requires digging holes or pouring concrete foundations to secure the mounting structures.
The solar panels or other equipment are then installed on the mounting structures.
Ground mounting work may also...
I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.
Agile is an iterative approach to software development, while SDLC is a linear approach.
Agile emphasizes on flexibility and adaptability to change.
SDLC follows a sequential process of planning, designing, building, testing, and deployment.
Agile involves continuous feedback and collaboration between the development team and stakeholders.
SDLC involves a formal review process at each stage of development.
Agile is best sui...
Top trending discussions
Interview experience
based on 891 reviews
Rating in categories
Assistant Manager
221
salaries
| ₹6.6 L/yr - ₹18.5 L/yr |
Senior Engineer
206
salaries
| ₹5 L/yr - ₹14 L/yr |
Engineer
185
salaries
| ₹2.8 L/yr - ₹12 L/yr |
Associate Manager
179
salaries
| ₹9 L/yr - ₹23.1 L/yr |
Senior Executive
154
salaries
| ₹5 L/yr - ₹19.1 L/yr |
Suzlon Group
Vestas
Inox Wind
GE Vernova