Upload Button Icon Add office photos

Filter interviews by

Shree Balaji Construction Civil Engineer Interview Questions and Answers

Updated 23 Aug 2022

Shree Balaji Construction Civil Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the compressive strength of M25 concrete
  • Ans. 

    The compressive strength of M25 concrete is typically around 25 megapascals (MPa).

    • M25 concrete is a mix of cement, sand, and aggregate in a ratio of 1:1:2.

    • The compressive strength of concrete is a measure of its ability to withstand compression.

    • The strength of M25 concrete is suitable for various construction applications.

    • Compressive strength is determined through laboratory testing of concrete samples.

  • Answered by AI
  • Q2. How to find the value of RL
  • Ans. 

    RL can be found by subtracting the back sight from the foresight.

    • RL stands for Reduced Level.

    • It is used to determine the elevation of a point with respect to a datum.

    • RL can be calculated by subtracting the back sight from the foresight.

    • The back sight is the reading taken on a staff held at a point of known elevation.

    • The foresight is the reading taken on a staff held at the point whose elevation is to be determined.

  • Answered by AI
  • Q3. RL=HI-IS/FS(Where RL = reduce lvl,HI=Hight of instrument,FS=Forte site )
  • Ans. 

    RL=HI-IS/FS is a formula used in civil engineering to calculate reduce level.

    • RL stands for reduce level

    • HI stands for height of instrument

    • IS stands for intermediate sight

    • FS stands for foresight

    • The formula is used to calculate the reduced level of a point on the ground relative to a benchmark

    • The benchmark is usually a known point with a known elevation

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shree Balaji Construction Civil Engineer interview:
  • Practically the site knowledge
Interview preparation tips for other job seekers - Be confident in yourself and think positive things to your fever

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. BBS ,QUANTITY TAKE OFF ,QUANTITY OF CONCRETE, lapping, and clear cover
  • Ans. Find accurate cutting length and find the total weight of rcc structure, find out all the quantity of structure, Lapping normal used 50d clear cover our for footing 50mm and beam 25mm and column for 40mm and slab 20mm
  • Answered by Jitu Behera
  • Q2. Bbs, mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to learn the skill
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. I have a experience 3+years
  • Q2. What about of Payments details
  • Q3. Please ask when & where is my interview

Interview Preparation Tips

Interview preparation tips for other job seekers - I have knowledge for Civil Site Engineer & also Billing Process
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Bbs,find out all quantity of structure. etc
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Minimum setting time of cement
  • Ans. 

    Minimum setting time of cement is the shortest time required for cement to harden and develop strength.

    • Minimum setting time varies depending on the type of cement and environmental conditions.

    • For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.

    • Factors affecting setting time include temperature, water-cement ratio, and presence of additives.

    • Setting time can be tested using Vicat appa

  • Answered by AI
  • Q2. Instrument used in surveying
  • Ans. 

    Theodolite is an instrument used in surveying to measure horizontal and vertical angles.

    • Theodolite is used to measure angles in both horizontal and vertical planes.

    • It consists of a telescope mounted on a base with graduated circles for precise measurements.

    • Theodolite is commonly used in construction, mapping, and land surveying.

    • Other instruments used in surveying include total stations, levels, and GPS receivers.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Brick work plaster work tile work flooring work cladding work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Basics concepts of civil Engineering
  • Q2. What is Bar Bending schedule
  • Ans. 

    Bar Bending Schedule is a document that provides details of reinforcement steel bars used in a construction project.

    • It includes details like bar mark, type of bar, diameter, length, shape, and bending dimensions.

    • It helps in estimating the quantity of steel required for the project.

    • It is essential for ensuring proper reinforcement placement as per structural design.

    • Bar Bending Schedule is prepared based on structural dr...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Talked about my interships and my final year projects
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Civil engineer reletive
Round 3 - HR 

(1 Question)

  • Q1. Hr reletive and any facility
Round 1 - Technical 

(2 Questions)

  • Q1. It's depends on Ur streams and their subject related questions if U have experience they are asking experience related questions about Ur key role and responsibilities
  • Q2. What's Ur favourite subject

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard with honesty without politics coordinator with all staff, clients and contractors. Maintain good relations to all don't care politics just go with flow

Shree Balaji Construction Interview FAQs

How many rounds are there in Shree Balaji Construction Civil Engineer interview?
Shree Balaji Construction interview process usually has 2 rounds. The most common rounds in the Shree Balaji Construction interview process are Resume Shortlist and Technical.
How to prepare for Shree Balaji Construction Civil Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shree Balaji Construction. The most common topics and skills that interviewers at Shree Balaji Construction expect are Civil Construction, Civil Engineering, Construction Management, Site Engineering and Site Operations.
What are the top questions asked in Shree Balaji Construction Civil Engineer interview?

Some of the top questions asked at the Shree Balaji Construction Civil Engineer interview -

  1. What is the compressive strength of M25 concr...read more
  2. RL=HI-IS/FS(Where RL = reduce lvl,HI=Hight of instrument,FS=Forte sit...read more
  3. How to find the value of...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 405 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.4
 • 18 Interviews
View all
Shree Balaji Construction Civil Engineer Salary
based on 8 salaries
₹1.5 L/yr - ₹3.6 L/yr
44% less than the average Civil Engineer Salary in India
View more details
Civil Site Engineer
34 salaries
unlock blur

₹1 L/yr - ₹6 L/yr

Site Engineer
19 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Accountant
10 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Civil Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹3.6 L/yr

Store Incharge
7 salaries
unlock blur

₹1.3 L/yr - ₹7 L/yr

Explore more salaries
Compare Shree Balaji Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Punj Lloyd

4.3
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview