Filter interviews by
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
The compressive strength of M25 concrete is typically around 25 megapascals (MPa).
M25 concrete is a mix of cement, sand, and aggregate in a ratio of 1:1:2.
The compressive strength of concrete is a measure of its ability to withstand compression.
The strength of M25 concrete is suitable for various construction applications.
Compressive strength is determined through laboratory testing of concrete samples.
RL can be found by subtracting the back sight from the foresight.
RL stands for Reduced Level.
It is used to determine the elevation of a point with respect to a datum.
RL can be calculated by subtracting the back sight from the foresight.
The back sight is the reading taken on a staff held at a point of known elevation.
The foresight is the reading taken on a staff held at the point whose elevation is to be determined.
RL=HI-IS/FS is a formula used in civil engineering to calculate reduce level.
RL stands for reduce level
HI stands for height of instrument
IS stands for intermediate sight
FS stands for foresight
The formula is used to calculate the reduced level of a point on the ground relative to a benchmark
The benchmark is usually a known point with a known elevation
Top trending discussions
posted on 30 Dec 2024
I am fascinated by the impact Civil Lines have on urban development and infrastructure.
The opportunity to contribute to the design and construction of roads, bridges, and buildings
The challenge of ensuring safety and efficiency in infrastructure projects
The chance to work on projects that improve the quality of life for communities
The satisfaction of seeing tangible results of your work, such as a new bridge connecting
I was impressed by your company's reputation for innovative projects and commitment to sustainability.
Reputation for innovative projects
Commitment to sustainability
Positive reviews from current employees
Company's values align with my own
Opportunities for professional growth and development
posted on 22 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
posted on 24 Jun 2024
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.
Proper planning is essential to streamline the casting process and avoid delays.
Use high-quality materials to ensure the durability and strength of the casted structure.
Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.
Implemen...
Managing a department involves effective communication, delegation, organization, and leadership.
Establish clear goals and expectations for the department.
Communicate regularly with team members to ensure everyone is on the same page.
Delegate tasks based on individual strengths and skills.
Provide support and guidance to team members when needed.
Monitor progress and performance to address any issues promptly.
Lead by exa...
posted on 11 Mar 2024
posted on 28 Apr 2024
Construction management involves planning, coordinating, and overseeing construction projects from start to finish.
Involves coordinating with architects, engineers, contractors, and other stakeholders
Includes scheduling, budgeting, quality control, and safety management
Responsible for ensuring projects are completed on time and within budget
Examples: creating project timelines, managing subcontractors, resolving constr
posted on 22 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
posted on 25 Mar 2024
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
posted on 23 Aug 2023
Civil Site Engineer
34
salaries
| ₹1 L/yr - ₹6 L/yr |
Site Engineer
19
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Accountant
10
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Civil Engineer
8
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Store Incharge
7
salaries
| ₹1.3 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
Tata Projects
Punj Lloyd
GMR Group