I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
The compressive strength of M25 concrete is typically around 25 megapascals (MPa).
M25 concrete is a mix of cement, sand, and aggregate in a ratio of 1:1:2.
The compressive strength of concrete is a measure of its ability to withstand compression.
The strength of M25 concrete is suitable for various construction applications.
Compressive strength is determined through laboratory testing of concrete samples.
RL can be found by subtracting the back sight from the foresight.
RL stands for Reduced Level.
It is used to determine the elevation of a point with respect to a datum.
RL can be calculated by subtracting the back sight from the foresight.
The back sight is the reading taken on a staff held at a point of known elevation.
The foresight is the reading taken on a staff held at the point whose elevation is to be determined.
RL=HI-IS/FS is a formula used in civil engineering to calculate reduce level.
RL stands for reduce level
HI stands for height of instrument
IS stands for intermediate sight
FS stands for foresight
The formula is used to calculate the reduced level of a point on the ground relative to a benchmark
The benchmark is usually a known point with a known elevation
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
posted on 2 Aug 2024
Concurrency problem occurs when multiple threads access shared resources simultaneously, leading to unexpected behavior.
Use synchronization mechanisms like locks, semaphores, or monitors to control access to shared resources.
Avoid race conditions by ensuring that critical sections of code are executed atomically.
Consider using thread-safe data structures or immutable objects to minimize the risk of concurrency issues.
posted on 15 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 3 interview rounds.
Strings and array concepts
posted on 16 Oct 2024
My name is John Smith, a seasoned engineer with over 10 years of experience in the field.
Full name: John Smith
Years of experience: 10+
Engineering background
I have completed 10 projects in my career as a senior engineer.
Completed 10 projects in various industries such as automotive, aerospace, and telecommunications.
Led a team of engineers to successfully complete a project for a major automotive company.
Implemented new technologies in projects to improve efficiency and performance.
Collaborated with cross-functional teams to deliver projects on time and within budget.
based on 90 reviews
Rating in categories
Civil Site Engineer
34
salaries
| ₹1 L/yr - ₹6 L/yr |
Site Engineer
19
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Accountant
10
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Store Incharge
7
salaries
| ₹1.3 L/yr - ₹7 L/yr |
Project Manager
7
salaries
| ₹4.1 L/yr - ₹8 L/yr |
GAMMON INDIA
Karam Industries
Saudi Oger
MaRS Planning & Engineering Services