Filter interviews by
posted on 2 Nov 2023
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
What are the most important project that need to be addressed
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Maintain regular communication and interaction with all staff members.
Regularly check in with staff to ensure they have the resources and support they need
Hold regular team meetings to discuss project progress and address any concerns
Encourage open communication and feedback from all team members
Provide opportunities for team building and collaboration
Lead by example by being accessible and approachable to all staff me
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
Total station errors can affect GPS to GPS measurements due to various factors.
Total station errors can include instrument calibration errors, atmospheric conditions, and human error.
Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.
Regular calibration and maintenance of the total station can
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I have 8 years of experience working as a Land Surveyor.
8 years of experience in land surveying
Proficient in using surveying equipment and software
Experience in conducting boundary surveys, topographic surveys, and construction staking
Familiar with relevant laws and regulations in land surveying
As a Land Surveyor, my role is to accurately measure and map the land, including boundaries, topography, and features for construction or development projects.
Accurately measure and map land boundaries
Analyze topography and features of the land
Provide data for construction or development projects
posted on 7 May 2024
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
The nominal brick size is typically 90 mm x 90 mm x 90 mm.
Nominal brick size is commonly 90 mm x 90 mm x 90 mm.
It may vary slightly depending on the country or region.
Brick sizes are standardized for construction purposes.
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.
One way slab is supported on two opposite sides, while two way slab is supported on all four sides.
One way slab is designed to carry loads predominantly in one direction.
Two way slab is designed to carry loads in both directions.
One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.
Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag
based on 9 reviews
Rating in categories
Deputy Manager
602
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
430
salaries
| ₹4 L/yr - ₹12.2 L/yr |
Construction Engineer
303
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Civil Site Engineer
233
salaries
| ₹1.5 L/yr - ₹9.2 L/yr |
Safety Officer
228
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra