Upload Button Icon Add office photos

Filter interviews by

Shapoorji Pallonji Group Land Surveyor Interview Questions and Answers

Updated 31 Mar 2023

Shapoorji Pallonji Group Land Surveyor Interview Experiences

2 interviews found

Land Surveyor Interview Questions & Answers

user image Anonymous

posted on 31 Mar 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

About surveying , traverse error closing, building set back checking process.

Round 3 - HR 

(2 Questions)

  • Q1. Why you want change current position & originations
  • Ans. 

    I am seeking a change in my current position and organization to further develop my skills and pursue new opportunities.

    • Seeking new challenges and growth opportunities

    • Desire to work in a different environment or industry

    • Wish to expand knowledge and skills in land surveying

    • Looking for better career prospects and advancement

    • Seeking a more fulfilling and rewarding role

  • Answered by AI
  • Q2. Salary bargaining & notice period
  • Ans. Salary bargaining too much . notice one month
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & professional . make sure your answer must be correct else tell him no idea

Land Surveyor Interview Questions & Answers

user image Anonymous

posted on 11 Oct 2020

Interview Questionnaire 

1 Question

  • Q1. How to calculate degree between two lines
  • Ans. 

    The degree between two lines can be calculated using trigonometry and the coordinates of the lines.

    • Find the slope of each line using the formula (y2 - y1) / (x2 - x1)

    • Calculate the angle between the slopes using the formula tan^-1((m2 - m1) / (1 + m1 * m2))

    • Convert the angle from radians to degrees

  • Answered by AI

Land Surveyor Interview Questions Asked at Other Companies

Q1. Convert quadrant bearing to whole circle bearing.
Q2. How many satellites want there gps receiver.
Q3. How to find out angle and distance a polygon.
Q4. How to calculate degree between two lines
Q5. There is 1 bech mark,how to setup machine total station??

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. I have done a survey work and am still doing it. I have worked in an underground metro project.
  • Q2. Diploma in land surveyor
  • Q3. I was working as a surveyor in Hindustan Construction Company. I have done survey work in this company for more than four years.
Round 2 - Technical 

(2 Questions)

  • Q1. 10+2 diploma in land surveyor
  • Q2. Diploma in land surveyor
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How much experience you have
  • Ans. 

    I have 8 years of experience working as a Land Surveyor.

    • 8 years of experience in land surveying

    • Proficient in using surveying equipment and software

    • Experience in conducting boundary surveys, topographic surveys, and construction staking

    • Familiar with relevant laws and regulations in land surveying

  • Answered by AI
  • Q2. What is your role
  • Ans. 

    As a Land Surveyor, my role is to accurately measure and map the land, including boundaries, topography, and features for construction or development projects.

    • Accurately measure and map land boundaries

    • Analyze topography and features of the land

    • Provide data for construction or development projects

  • Answered by AI

I applied via LinkedIn and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. I was not asked questions
  • Q2. Land survey
  • Q3. Ward, Excel and AutoCAD
  • Q4. Land Survey quantity

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I am Azimul Haque. I have been working on land survey for 4 years. Total station sokkia and word and excel and AutoCAD. I can do everything.I am 10th pass 2015 and 12th pass 2017 and iti 2022 hold.

Interview Questionnaire 

7 Questions

  • Q1. Convert quadrant bearing to whole circle bearing.
  • Ans. 

    To convert quadrant bearing to whole circle bearing, add 90 degrees to the quadrant bearing.

    • Quadrant bearings range from 0 to 90 degrees.

    • Whole circle bearings range from 0 to 360 degrees.

    • To convert, add 90 degrees to the quadrant bearing.

    • For example, a quadrant bearing of N45°E would become 135°.

  • Answered by AI
  • Q2. What is contour.
  • Ans. 

    Contours are lines on a map that connect points of equal elevation, representing the shape and relief of the land.

    • Contours are used in land surveying to depict the topography of an area.

    • They connect points of equal elevation, allowing surveyors to visualize the shape and relief of the land.

    • Contours are typically represented as curved lines on a map, with each line representing a specific elevation.

    • The spacing between c...

  • Answered by AI
  • Q3. How to find out angle and distance a polygon.
  • Ans. 

    To find out the angle and distance of a polygon, you can use trigonometry and surveying techniques.

    • Measure the lengths of each side of the polygon using a tape measure or surveying equipment.

    • Use a theodolite or total station to measure the angles between each side of the polygon.

    • Apply trigonometric formulas to calculate the angles and distances based on the measured values.

    • For example, you can use the Law of Cosines to...

  • Answered by AI
  • Q4. What is UTM
  • Ans. 

    UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.

    • UTM is a grid-based system that divides the Earth into 60 zones, each 6 degrees of longitude wide.

    • It uses a metric coordinate system, with eastings and northings measured in meters.

    • UTM coordinates consist of a zone number, hemisphere (N or S), easting, and northing.

    • For example, a UTM coordinate might ...

  • Answered by AI
  • Q5. What is WGS
  • Ans. 

    WGS stands for World Geodetic System, a standard reference system used for mapping and surveying the Earth.

    • WGS is a global coordinate system used to accurately represent the Earth's surface.

    • It provides a consistent framework for measuring and locating points on the Earth's surface.

    • WGS is commonly used in GPS navigation, cartography, and land surveying.

    • It uses latitude and longitude coordinates to define positions on th...

  • Answered by AI
  • Q6. How to work GPS
  • Ans. 

    Working with GPS involves understanding its functions, using the correct equipment, and interpreting the data accurately.

    • Learn the basic functions of GPS devices and how to operate them.

    • Ensure that the GPS device is properly calibrated and has a clear view of the sky for accurate readings.

    • Use the appropriate GPS equipment for the specific surveying task, such as a handheld GPS unit or a survey-grade GPS receiver.

    • Unders...

  • Answered by AI
  • Q7. How many satellites want there gps receiver.
  • Ans. 

    The number of satellites a GPS receiver wants depends on its accuracy requirements and the availability of satellite signals.

    • The minimum number of satellites required for a GPS receiver to function is 4.

    • Most GPS receivers aim to acquire signals from at least 8 to 12 satellites for better accuracy.

    • The more satellites a GPS receiver can track, the more accurate its positioning and timing information becomes.

    • GPS receivers...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Very arjent work going every time
  • Q2. Site co-ordinate problem
  • Ans. 

    Site coordinate problems can arise due to incorrect measurements, outdated maps, or human error.

    • Ensure all measurements are accurate and up-to-date

    • Use GPS technology for precise location data

    • Double check all calculations and coordinates before proceeding

    • Consult with other surveyors or experts if unsure

    • Example: If a building is constructed in the wrong location due to incorrect coordinates, it can lead to legal disputes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Every time
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.

I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Related about to quantity and IS codes.
  • Q2. According to IS code and as per site execution knowledge I answered.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension at the time of interview. And if you don't know that you clearly describe that what youu know and what you don't.

Interview Questionnaire 

2 Questions

  • Q1. I asked you can survey on the field
  • Q2. Yas can i survey

Shapoorji Pallonji Group Interview FAQs

How many rounds are there in Shapoorji Pallonji Group Land Surveyor interview?
Shapoorji Pallonji Group interview process usually has 3 rounds. The most common rounds in the Shapoorji Pallonji Group interview process are Resume Shortlist, Group Discussion and HR.

Tell us how to improve this page.

Shapoorji Pallonji Group Land Surveyor Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
Tata Group Interview Questions
4.2
 • 358 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
View all
Shapoorji Pallonji Group Land Surveyor Salary
based on 45 salaries
₹2.5 L/yr - ₹8.5 L/yr
At par with the average Land Surveyor Salary in India
View more details

Shapoorji Pallonji Group Land Surveyor Reviews and Ratings

based on 11 reviews

4.3/5

Rating in categories

4.7

Skill development

4.1

Work-life balance

3.9

Salary

4.5

Job security

4.2

Company culture

3.8

Promotions

4.5

Work satisfaction

Explore 11 Reviews and Ratings
Deputy Manager
605 salaries
unlock blur

₹6 L/yr - ₹16 L/yr

Senior Engineer
427 salaries
unlock blur

₹4 L/yr - ₹12 L/yr

Construction Engineer
301 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Civil Site Engineer
227 salaries
unlock blur

₹1.5 L/yr - ₹9 L/yr

Civil Supervisor
224 salaries
unlock blur

₹1.5 L/yr - ₹5.6 L/yr

Explore more salaries
Compare Shapoorji Pallonji Group with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview