Filter interviews by
Be the first one to contribute and help others!
posted on 9 Aug 2022
I was interviewed in Apr 2023.
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
posted on 12 Aug 2022
I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2022. There were 5 interview rounds.
My concrete work level is excellent and I have experience in various finishing techniques.
I have experience in pouring and leveling concrete for foundations, walls, and slabs.
I am skilled in using various finishing techniques such as troweling, stamping, and staining.
I pay close attention to detail to ensure a smooth and even finish.
I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS is used in drawing work to ensure the correct amount of reinforcement is used in a structure.
It includes details such as bar diameter, length, shape, and placement.
BBS helps in estimating the amount of steel required for a project and also helps in cost estimation.
It is an important part of the construction process an...
Yes, system operation is crucial for efficient production management.
Efficient system operation ensures smooth production processes.
It helps in reducing downtime and increasing productivity.
Regular maintenance and updates are necessary for optimal system performance.
Proper training of staff on system usage is important.
Examples: ERP systems, inventory management systems, production scheduling software.
posted on 18 Apr 2021
I applied via Walk-in and was interviewed in Mar 2021. There were 4 interview rounds.
I have a diverse background in technical roles and have gained experience in various industries.
Started my career as a software engineer at XYZ Company, where I developed and maintained software applications for clients.
Worked as a technical consultant at ABC Consulting, providing technical expertise and support to clients in implementing software solutions.
Led a team of engineers at DEF Corporation, overseeing the dev...
I want to join Torrent Group because of its strong reputation, diverse portfolio, and commitment to innovation.
Torrent Group has a strong reputation in the industry, known for its ethical practices and high standards.
The company has a diverse portfolio, operating in various sectors such as power, pharmaceuticals, and infrastructure.
Torrent Group is committed to innovation, constantly investing in research and developme...
I want to do a job because it offers practical experience and opportunities for growth.
Job provides hands-on experience in real-life situations.
Job offers opportunities to apply theoretical knowledge in practical scenarios.
Job allows for personal and professional growth through challenges and learning.
Job provides a platform to develop skills and expertise in a specific field.
Job offers a chance to contribute to the or...
During my articleship, I gained exposure to various technical aspects of management including financial analysis, project management, and data analysis.
Financial analysis: Assisted in preparing financial statements, conducting ratio analysis, and evaluating investment opportunities.
Project management: Worked on multiple projects, coordinating with cross-functional teams, and ensuring timely completion.
Data analysis: An...
Ind AS 116, 19, and AD 115 are accounting standards related to lease accounting, employee benefits, and revenue recognition respectively.
Ind AS 116 deals with lease accounting and replaces the previous standard Ind AS 17.
Ind AS 19 deals with employee benefits and requires companies to recognize the cost of providing employee benefits.
Ind AS 115 deals with revenue recognition and requires companies to recognize revenue ...
I applied via Naukri.com and was interviewed in Nov 2021. There were 4 interview rounds.
posted on 18 Nov 2021
based on 32 reviews
Rating in categories
Assistant Manager
8
salaries
| ₹9.2 L/yr - ₹15 L/yr |
Senior Engineer
7
salaries
| ₹5 L/yr - ₹10 L/yr |
Engineer
4
salaries
| ₹3.7 L/yr - ₹6 L/yr |
Junior Engineer
4
salaries
| ₹2.3 L/yr - ₹3.8 L/yr |
Instrument Engineer
4
salaries
| ₹2.7 L/yr - ₹4.2 L/yr |
Suzlon Group
NTPC
Adani Group
Tata Power