Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Hitachi Energy Team. If you also belong to the team, you can get access from here

Hitachi Energy Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Hitachi Energy Production Manager Interview Questions and Answers

Updated 17 Nov 2021

Hitachi Energy Production Manager Interview Experiences

1 interview found

Interview Questionnaire 

3 Questions

  • Q1. I have not any digree but iam above 20 years experience in sheet mental fabrication and all rounder except computer technology
  • Q2. ITI incomplete
  • Q3. Should system opparation
  • Ans. 

    Yes, system operation is crucial for efficient production management.

    • Efficient system operation ensures smooth production processes.

    • It helps in reducing downtime and increasing productivity.

    • Regular maintenance and updates are necessary for optimal system performance.

    • Proper training of staff on system usage is important.

    • Examples: ERP systems, inventory management systems, production scheduling software.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience certificates and test

Skills evaluated in this interview

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Mar 2018. There was 1 interview round.

Interview Preparation Tips

General Tips: Interviewer is very sound in technical so he was asking about total application wise and technical questions related to electrical.
Skills: Communication, Body Language, Decision Making Skills
Duration: >3 Months

I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my job
Round 3 - Aptitude Test 
Round 4 - Assignment 

Manager related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good experience in Adani till today

I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Technical Interview on Power Systems/Switchgear & Control System. Detailed discussion on Switchgear and Protection. Discussion on IEC and IS standards.
  • Q2. HR interview on experience and Pay scale
  • Q3. Detailed discussion on experience and expectations.
  • Q4. Baground & Certificate verification

Interview Preparation Tips

Round: Resume Shortlist
Experience: Engineering Degree & Suitable profile

Round: Group Discussion
Experience: Topic : Switchgear & Control System.

I have actively participated in technical discussion.

Round: Second level of technical round with higher authority
Experience: Details analysis on market segment

Round: Case Study Interview
Experience: Case study on my interest and profile interested in.

General Tips: Prepare and answer correctly to the questions you asked, do not lead interviewer in wrong way. Interviewers will easily guess what we are delivering.

Be 100% interested on your profile & role, Don't attend interview for the shake of job.

Skills: Technical Knowledge(ML, Communication, Body Language, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills
Duration: 1-3 Months

I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Experience related questions Materials selection, material properties Types of hardwares, bolted joints types
Round 3 - Technical 

(1 Question)

  • Q1. Model test on Autodesk Inventor
Round 4 - HR 

(1 Question)

  • Q1. CTC Related discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with you resume/ CV questions more related to resume and experience

I applied via Company Website and was interviewed in Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Various production related
Round 3 - Case Study 

Interview questions asked

Round 4 - HR 

(1 Question)

  • Q1. Salary, performance etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn what u do daily???? And try to improve everyday.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Material , cad modelling
  • Q2. Previous projects, welding ndt

Interview Preparation Tips

Interview preparation tips for other job seekers - Welding , ndt , calculations, modeling, nut blots , Assembly
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
-

I applied via Walk-in and was interviewed before May 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Technical & sense of humor knowledge position related

Round 3 - One-on-one 

(4 Questions)

  • Q1. The previous job related knowledge and technical knowledge
  • Q2. Previous job responsibilities, working & process
  • Q3. Previous job-related process , equipment
  • Q4. What is your plant process
  • Ans. 

    Our plant process involves several stages including raw material procurement, production, quality control, and packaging.

    • We start by procuring high-quality raw materials from trusted suppliers.

    • The raw materials are then processed through various stages of production to create the final product.

    • Throughout the production process, we have strict quality control measures in place to ensure the product meets our high standa...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. HR-related formalities, policy and system discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - More study related previous job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As per our resume past experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Details about Job description
Round 4 - HR 

(1 Question)

  • Q1. Personal information and previous experience documents
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About experience
Round 2 - One-on-one 

(2 Questions)

  • Q1. What type liaison you do at your present organization
  • Ans. 

    I regularly liaise with various departments to ensure smooth operations and communication.

    • Coordinate with sales team to track inventory levels

    • Collaborate with HR for recruitment and training programs

    • Communicate with IT department for software updates

    • Work closely with finance team for budget planning

  • Answered by AI
  • Q2. What is TSR and 30 years record of land.
  • Ans. 

    TSR stands for Town Survey Record, a document maintained by the government that contains details of land ownership and usage over the past 30 years.

    • TSR is a record maintained by the government to keep track of land ownership and usage.

    • It contains information about the history of land transactions, ownership changes, and land use patterns over the past 30 years.

    • TSR is important for verifying land ownership, resolving di...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interviews and excellent HR response

Hitachi Energy Interview FAQs

How to prepare for Hitachi Energy Production Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Hitachi Energy. The most common topics and skills that interviewers at Hitachi Energy expect are CCTV Monitoring, Capacity Planning, Continuous Improvement, Fabrication and MS Office.
What are the top questions asked in Hitachi Energy Production Manager interview?

Some of the top questions asked at the Hitachi Energy Production Manager interview -

  1. Should system opparati...read more
  2. I have not any digree but iam above 20 years experience in sheet mental fabrica...read more
  3. ITI incomple...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 250 Interviews
ABB Interview Questions
4.1
 • 233 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Tata Power Interview Questions
3.9
 • 161 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 118 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
View all
Hitachi Energy Production Manager Salary
based on 16 salaries
₹11.1 L/yr - ₹30 L/yr
25% more than the average Production Manager Salary in India
View more details

Hitachi Energy Production Manager Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

3.4

Skill development

4.0

Work-life balance

3.4

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Project Engineer
334 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Associate Project Engineer
260 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

R&D Engineer
127 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
122 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
118 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Hitachi Energy with

Siemens Energy

4.1
Compare

ABB

4.1
Compare

Schneider Electric

4.1
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview