The w/c ratio for moderate condition for concrete mix is typically between 0.45 to 0.55.
The w/c ratio determines the strength and workability of the concrete mix.
Moderate conditions refer to average temperature and humidity levels.
A w/c ratio of 0.45 to 0.55 is suitable for most construction projects.
Higher w/c ratios can result in weaker and more porous concrete.
Lower w/c ratios can make the mix difficult to work with
AIV sand zone limits refer to the maximum allowable acoustic impedance variation in sand formations.
AIV sand zone limits are determined based on the type of sand formation and the surrounding rock formations.
The limits are set to prevent damage to wellbore equipment and ensure safe drilling operations.
For example, in some formations, the AIV limit may be set at 20% while in others it may be as low as 5%.
AIV limits can ...
Top trending discussions
posted on 29 Nov 2024
I applied via Campus Placement and was interviewed before Nov 2023. There were 3 interview rounds.
Reasoning portion, quantitative aptitude portion
Technical group discussion
posted on 10 May 2024
posted on 20 Oct 2023
Question regarding civil Engineer
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 22 Dec 2022
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce concrete of desired strength and durability.
Grade of concrete refers to the strength of the concrete mix, which is determined by its compressive strength after 28 days of curing.
Lab testing for concrete includes tests for compressive strength, slump, air content, and density.
Mix design involves selecting the...
The question is related to the process of making level sheets using WMM, WBM, DBM, and BC.
Level sheet making involves the use of different materials such as WMM, WBM, DBM, and BC.
WMM stands for Wet Mix Macadam and is used as a base layer for roads.
WBM stands for Water Bound Macadam and is used as a base layer for flexible pavements.
DBM stands for Dense Bituminous Macadam and is used as a binder course layer for roads.
B...
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 22 Dec 2021
I applied via Naukri.com and was interviewed before Dec 2020. There were 2 interview rounds.
Costing and budget of building
Costing and budgeting are crucial aspects of any building project
It involves estimating the cost of materials, labor, and other expenses
Creating a budget helps in managing the project and avoiding overspending
Regular monitoring and updating of the budget is necessary to ensure the project stays on track
Factors like inflation, unexpected expenses, and changes in scope can impact the budget
Civil Site Engineer
19
salaries
| ₹2.3 L/yr - ₹4 L/yr |
Project Manager
12
salaries
| ₹10 L/yr - ₹18.2 L/yr |
Store Executive
10
salaries
| ₹2.7 L/yr - ₹4 L/yr |
Civil Engineer
8
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Site Engineer
8
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure