Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Scc Infrastructure Team. If you also belong to the team, you can get access from here

Scc Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Scc Infrastructure Assistant Store Keeper Interview Questions and Answers

Updated 10 Feb 2022

Scc Infrastructure Assistant Store Keeper Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. What kind of buitmens?what density sand ?
  • Ans. 

    The type of building materials required for construction and the density of sand depend on the specific project and its requirements.

    • The type of building materials needed for construction can vary based on factors such as the type of structure, location, and purpose.

    • Common building materials include bricks, cement, steel, wood, and concrete.

    • The density of sand can vary depending on its composition and moisture content.

    • ...

  • Answered by AI

Interview questions from similar companies

I was interviewed before Oct 2016.

Interview Questionnaire 

2 Questions

  • Q1.  turbine erection alignment and comissioning procedure
  • Ans. 

    Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.

    • Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.

    • Commissioning procedure includes testing and verifying the functionality of the turbine.

    • Alignment is typically done using laser alignment tools to ensure precise po...

  • Answered by AI
  • Q2. Turbine erection sequence
  • Ans. 

    The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.

    • The foundation is prepared and the anchor bolts are installed.

    • The base frame is positioned and aligned with the anchor bolts.

    • The turbine tower sections are lifted and assembled on top of the base frame.

    • The nacelle, which houses the turbine's generator and other components, is installed on top of t...

  • Answered by AI

Interview Preparation Tips

Round: HR Interview
Experience: they are satisfy with my answers
Tips: explain exactly what you know

Round: Technical Interview
Experience: i explain what i know exactly

Skills: Thermal Power Plant Engineering

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

Tell us how to improve this page.

Scc Infrastructure Assistant Store Keeper Salary
based on 4 salaries
₹2 L/yr - ₹2.6 L/yr
16% less than the average Assistant Store Keeper Salary in India
View more details
Civil Site Engineer
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Scc Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview