Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
The number of robots in one line at my last company varied depending on the production line, but typically ranged from 5 to 10 robots.
The number of robots in one line varied based on the specific production line requirements.
On average, there were between 5 to 10 robots in one line at my last company.
Some production lines required more robots for increased automation and efficiency.
The exact number of robots in one lin...
The number of manpower in one line in my last company varied depending on the production line and shift schedule.
The manpower in one line ranged from 10 to 20 workers per shift.
There were multiple production lines in the factory, each with a different number of workers.
During peak production times, additional manpower was allocated to each line.
The number of manpower in one line was adjusted based on the production dem
I was responsible for assisting in various engineering projects, including design, testing, and analysis.
Assisted in designing new products and systems
Conducted testing and analysis to ensure quality and performance
Collaborated with team members to troubleshoot and solve engineering problems
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
Satyam Auto Components interview questions for popular designations
I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.
Stick out refers to the distance by which a component extends beyond the surface it is mounted on.
Stick out is the distance a component protrudes from the surface it is attached to.
It is important to consider stick out when designing components to ensure proper fit and function.
For example, in engineering, the stick out of a bolt refers to the length of the bolt that extends beyond the nut.
Get interview-ready with Top Satyam Auto Components Interview Questions
posted on 24 Feb 2023
I was interviewed in Jan 2023.
Zero breakdown in line maintenance is the goal of any maintenance team.
Regular preventive maintenance checks
Proper lubrication of machines
Timely replacement of worn-out parts
Training of maintenance staff
Use of advanced technologies like predictive maintenance
Continuous monitoring of equipment performance
Releated professional and Industrial relations
Along with management team
I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.
I am a Press Shop Production Engineer with experience in managing production processes and optimizing efficiency.
Experienced in overseeing press shop operations and ensuring smooth production flow
Proficient in analyzing production data and implementing process improvements
Skilled in troubleshooting equipment issues and minimizing downtime
Strong knowledge of safety regulations and ensuring compliance
Collaborative team p...
I handle multiple presses and manage the manpower efficiently.
I have experience in handling various types of presses, including hydraulic, mechanical, and pneumatic presses.
I am responsible for coordinating the workflow and ensuring that the presses are operating at optimal efficiency.
I allocate manpower effectively, considering the workload and skill sets of the team members.
I prioritize tasks and assign operators to ...
posted on 3 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
A work proximity sensor is a device that detects the presence of objects or people within a certain distance of the sensor.
It is commonly used in industrial settings to ensure worker safety around heavy machinery.
The sensor emits a field of electromagnetic radiation and detects changes in the field caused by the presence of an object or person.
It can be used to trigger alarms or shut down machinery if someone or someth...
The A/C volt India frequency is 50 Hz.
The A/C volt India frequency is standardized at 50 Hz.
This frequency is used for alternating current (A/C) power supply in India.
It is important for electricians to be aware of this frequency when working with electrical systems.
For comparison, some other countries use a frequency of 60 Hz for A/C power supply.
A/C current can be converted to 24 volt DC using a rectifier and a voltage regulator.
Use a rectifier to convert A/C current to pulsating DC current
Filter the pulsating DC current using a capacitor
Use a voltage regulator to regulate the voltage to 24 volts DC
Examples of rectifiers include diodes and bridge rectifiers
Our organization ensures change management through a structured process that involves documentation, review, and approval.
We have a change management policy in place that outlines the process for requesting, reviewing, and approving changes.
All change requests are documented and reviewed by a designated change control board.
The change control board evaluates the impact of the change on quality, safety, and regulatory c...
Top trending discussions
Interview experience
based on 399 reviews
Rating in categories
Engineer
177
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Assistant Engineer
145
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Production Engineer
140
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Quality Engineer
120
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Senior Engineer
92
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Bharat Forge
Samvardhana Motherson Group
Bosch
TVS Sundram Fasteners