Rubberwala Housing & Infrastructure Project Manager Interview Questions and Answers for Experienced

Updated 19 Oct 2023

Rubberwala Housing & Infrastructure Project Manager Interview Experiences for Experienced

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. All previous company work experience share
Round 3 - Technical 

(1 Question)

  • Q1. More than 40to 60 question

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Base practices in ASPICE
  • Q2. Scope management and schedule
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Self introduction
  • Q2. Experience in the concern field
Round 2 - HR 

(2 Questions)

  • Q1. They will ask about your previous experience
  • Q2. Will ask about previous salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. No competence person during interview process
  • Q2. Just established new department so no interview
Round 2 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Non technical ompetene person

Interview Preparation Tips

Interview preparation tips for other job seekers - Very BAD EPERIENCE WITH MR RAJESH REDDY RUDE AND RUBBISH SHIT BEHAVIOUR AOG WITHHR RAMAROA

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions related to Project Management and Critical works handled, Float
Round 3 - HR 

(1 Question)

  • Q1. Notice period, Salary negotiation, reasons for relocation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared on your own background

I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. How you can delivery your project in time?
  • Q2. What is your think to be a team leader?
  • Q3. How you control the cost?
  • Ans. 

    Cost control is achieved through effective planning, monitoring, and controlling of project expenses.

    • Create a detailed project budget and track expenses against it

    • Identify potential cost overruns and take corrective actions

    • Negotiate with vendors and suppliers for better pricing

    • Use cost-effective resources and materials

    • Regularly review and update the project budget

    • Implement cost-saving measures without compromising qual

  • Answered by AI
  • Q4. What action to be taken during lockdown and pandamic situation?
  • Ans. 

    During lockdown and pandemic situation, it is important to prioritize the safety of the team and stakeholders while ensuring project continuity.

    • Ensure remote work infrastructure is in place

    • Communicate regularly with team and stakeholders

    • Adjust project timelines and deliverables as needed

    • Identify and mitigate project risks

    • Stay up-to-date with government regulations and guidelines

    • Encourage team members to prioritize self

  • Answered by AI
  • Q5. How you satisfied our client if project are going to delay without any penalty?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Total Qty of steel in OHT.
  • Ans. 

    The total quantity of steel in OHT is calculated by summing up the individual quantities of steel used in the construction.

    • Calculate the quantity of steel used in each component of the OHT (e.g. beams, columns, slabs, etc.)

    • Sum up the individual quantities to get the total quantity of steel in OHT

    • Consider any additional steel reinforcements or accessories used in the construction

  • Answered by AI
  • Q2. But fusion joint for pipeline
  • Ans. 

    Fusion joint is a method used to join pipes in a pipeline by heating the ends and pressing them together to create a strong bond.

    • Fusion joint involves heating the ends of the pipes to a specific temperature

    • The heated ends are then pressed together to form a strong bond

    • This method is commonly used in industries like oil and gas for pipeline construction

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Project Monitoring, scheduling Analyze projects, budget, cash flow, coordination with contractors, Consultant and allied services, construction, resource management, quality control and quality assurance, ...
Round 2 - Group Discussion 

Already talked to you

Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Base practices in ASPICE
  • Q2. Scope management and schedule

Rubberwala Housing & Infrastructure Interview FAQs

How many rounds are there in Rubberwala Housing & Infrastructure Project Manager interview for experienced candidates?
Rubberwala Housing & Infrastructure interview process for experienced candidates usually has 3 rounds. The most common rounds in the Rubberwala Housing & Infrastructure interview process for experienced candidates are Resume Shortlist, HR and Technical.
How to prepare for Rubberwala Housing & Infrastructure Project Manager interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rubberwala Housing & Infrastructure. The most common topics and skills that interviewers at Rubberwala Housing & Infrastructure expect are Construction Management, Project Management, PM, Project Engineering and Site Execution.

Tell us how to improve this page.

People are getting interviews through

based on 1 Rubberwala Housing & Infrastructure interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Rubberwala Housing & Infrastructure Project Manager Salary
based on 4 salaries
₹9.2 L/yr - ₹15.5 L/yr
46% less than the average Project Manager Salary in India
View more details

Rubberwala Housing & Infrastructure Project Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Site Engineer
8 salaries
unlock blur

₹4 L/yr - ₹6.8 L/yr

Executive Accountant
8 salaries
unlock blur

₹3.8 L/yr - ₹4.9 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Senior Civil Site Engineer
4 salaries
unlock blur

₹5.6 L/yr - ₹6.7 L/yr

Site Supervisor
4 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Rubberwala Housing & Infrastructure with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview