Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Rubberwala Housing & Infrastructure Team. If you also belong to the team, you can get access from here

Rubberwala Housing & Infrastructure Verified Tick

Compare button icon Compare button icon Compare
3.4

based on 33 Reviews

Filter interviews by

Rubberwala Housing & Infrastructure Billing Executive Interview Questions and Answers

Updated 7 Jun 2024

Rubberwala Housing & Infrastructure Billing Executive Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How to take off quantity???
  • Ans. 

    Taking off quantity involves measuring and calculating the amount of materials needed for a project.

    • Measure the dimensions of the area where the materials will be used

    • Calculate the volume or area to determine the quantity needed

    • Consider any waste or extra materials that may be required

    • Use software or formulas to assist in accurate quantity take-offs

    • Double-check calculations to ensure accuracy

  • Answered by AI
  • Q2. What is the basic rate??
  • Ans. 

    The basic rate is the standard price charged for a particular service or product.

    • The basic rate is the starting point for calculating additional charges or discounts.

    • It is usually fixed and does not vary based on specific circumstances.

    • For example, a hotel room may have a basic rate of $100 per night before any additional fees are added.

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Project Scheduling
  • Q2. Cost Management
  • Q3. Rate Analysis of BOQ Items
  • Ans. 

    Rate analysis of BOQ items involves calculating the rates of various items in the Bill of Quantities.

    • Rate analysis involves determining the cost of materials, labor, and equipment for each item in the BOQ.

    • It helps in estimating the total cost of a project and comparing it with the budget.

    • Factors like market rates, location, and project specifications are considered in rate analysis.

    • Example: Calculating the rate of conc...

  • Answered by AI
  • Q4. Standard output of Machinery
  • Ans. 

    Standard output of Machinery refers to the expected production rate or quantity of goods produced by a machine in a given time period.

    • Standard output is determined by the capacity and efficiency of the machinery.

    • Factors affecting standard output include machine speed, maintenance, and operator skill.

    • Examples of standard output measurements include units per hour, tons per day, or meters per minute.

  • Answered by AI
  • Q5. Material Reconciliation
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Core Technical questions related to job profile
  • Q2. Billing process, some quantity Question
Round 2 - Aptitude Test 

Summary question and also some coding of alphabet

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Quantity surveyor
  • Q2. Planning & monitoring
  • Q3. Regarding to Billing and Planning

Interview Preparation Tips

Interview preparation tips for other job seekers - no
Round 1 - Technical 

(2 Questions)

  • Q1. Basically whatever you doing
  • Q2. All about billing & planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Best salary, house rent for both family & bachelor

I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Prepare BBS sheet , study a drawing and calculate the Quantity Details , about Contractors Billing, preparing Daily and monthly progress report,Study the Drawing and BOQ preparation and raising the materi...

Interview Preparation Tips

Topics to prepare for G R Infraprojects Billing Engineer interview:
  • Billing
Interview preparation tips for other job seekers - Don’t worry.They are Very Friendly. If you don’t know the answer of any questions then tell them. They will give you the answer.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Escalation, Contractor bill
  • Q2. Esclation, is code 1200 all part

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company but salary late
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Relevant experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Gk , aptitude and technical

Round 3 - Technical 

(2 Questions)

  • Q1. Billing is code
  • Ans. 

    Billing is the process of generating invoices for goods or services provided.

    • Billing involves calculating costs, creating invoices, and sending them to customers.

    • It is important for tracking revenue and ensuring timely payment.

    • Examples of billing software include QuickBooks, FreshBooks, and Zoho Invoice.

  • Answered by AI
  • Q2. Earth work excavation is code

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Client bills, Civil software's like Ms project, Auto Cad, Road Estimator, excel and etc.
Round 3 - Technical 

(1 Question)

  • Q1. About your core knowledge of work

Rubberwala Housing & Infrastructure Interview FAQs

How many rounds are there in Rubberwala Housing & Infrastructure Billing Executive interview?
Rubberwala Housing & Infrastructure interview process usually has 1 rounds. The most common rounds in the Rubberwala Housing & Infrastructure interview process are One-on-one Round.
What are the top questions asked in Rubberwala Housing & Infrastructure Billing Executive interview?

Some of the top questions asked at the Rubberwala Housing & Infrastructure Billing Executive interview -

  1. How to take off quantity...read more
  2. What is the basic rat...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Rubberwala Housing & Infrastructure interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.7
 • 251 Interviews
TCE Interview Questions
3.8
 • 240 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 128 Interviews
View all
Site Engineer
8 salaries
unlock blur

₹4 L/yr - ₹6.8 L/yr

Executive Accountant
8 salaries
unlock blur

₹3.8 L/yr - ₹4.9 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Senior Civil Site Engineer
4 salaries
unlock blur

₹5.6 L/yr - ₹6.7 L/yr

Site Supervisor
4 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Rubberwala Housing & Infrastructure with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview