Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Rubberwala Housing & Infrastructure Team. If you also belong to the team, you can get access from here

Rubberwala Housing & Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Rubberwala Housing & Infrastructure Interview Questions and Answers

Updated 2 Aug 2024

Rubberwala Housing & Infrastructure Interview Experiences

Popular Designations

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How to take off quantity???
  • Ans. 

    Taking off quantity involves measuring and calculating the amount of materials needed for a project.

    • Measure the dimensions of the area where the materials will be used

    • Calculate the volume or area to determine the quantity needed

    • Consider any waste or extra materials that may be required

    • Use software or formulas to assist in accurate quantity take-offs

    • Double-check calculations to ensure accuracy

  • Answered by AI
  • Q2. What is the basic rate??
  • Ans. 

    The basic rate is the standard price charged for a particular service or product.

    • The basic rate is the starting point for calculating additional charges or discounts.

    • It is usually fixed and does not vary based on specific circumstances.

    • For example, a hotel room may have a basic rate of $100 per night before any additional fees are added.

  • Answered by AI

Billing Executive Interview Questions asked at other Companies

Q1. If a customer doesn't have a GST, how will you ship the goods him...?
View answer (3)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. All previous company work experience share
Round 3 - Technical 

(1 Question)

  • Q1. More than 40to 60 question

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How would you contribute to manage directors schedule efficiently?
  • Ans. 

    I would use time management tools, prioritize tasks, and communicate effectively with the managing director.

    • Utilize calendar apps to schedule meetings and appointments

    • Prioritize tasks based on urgency and importance

    • Set reminders for important deadlines

    • Communicate regularly with the managing director to update on schedule changes

    • Anticipate potential conflicts and proactively resolve them

  • Answered by AI
  • Q2. How would you manage multiple tasks given?
  • Ans. 

    I would prioritize tasks based on deadlines and importance, utilize time management techniques, and communicate effectively with stakeholders.

    • Prioritize tasks based on deadlines and importance

    • Utilize time management techniques such as creating to-do lists and setting reminders

    • Communicate effectively with stakeholders to manage expectations and provide updates

    • Delegate tasks when necessary to ensure all tasks are complet

  • Answered by AI

Executive Assistant to Managing Director Interview Questions asked at other Companies

Q1. How to make the process more smoother as there is too much politics involved?
View answer (2)

I applied via Walk-in and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tally Data Entry, GST and TDS rate & Return filing date,

Interview Preparation Tips

Interview preparation tips for other job seekers - Have correct knowledge of GST and TDS rate and return
How to Pass Entry of RCM, TDS & GST Invoice working

Executive Accountant Interview Questions asked at other Companies

Q1. What is the file extension name which is created by the TDS Return software
View answer (4)

Rubberwala Housing & Infrastructure interview questions for popular designations

 Project Manager

 (1)

 Executive Assistant to Managing Director

 (1)

 Billing Executive

 (1)

 Executive Accountant

 (1)

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Working purpos
  • Q2. How to E. T. S work
  • Ans. 

    ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.

    • ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.

    • The organization also offers research and assessment services for educational institutions.

    • ETS uses computer-based testing and scoring for many of its exams.

    • The organization has faced criticism for its role in the standardized testing in

  • Answered by AI

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

Rubberwala Housing & Infrastructure Interview FAQs

How many rounds are there in Rubberwala Housing & Infrastructure interview?
Rubberwala Housing & Infrastructure interview process usually has 1-2 rounds. The most common rounds in the Rubberwala Housing & Infrastructure interview process are One-on-one Round, Resume Shortlist and HR.
How to prepare for Rubberwala Housing & Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rubberwala Housing & Infrastructure. The most common topics and skills that interviewers at Rubberwala Housing & Infrastructure expect are Construction Management, Project Management, Accounting, Boq and Finishing.
What are the top questions asked in Rubberwala Housing & Infrastructure interview?

Some of the top questions asked at the Rubberwala Housing & Infrastructure interview -

  1. How would you manage multiple tasks giv...read more
  2. How to take off quantity...read more
  3. What is the basic rat...read more

Tell us how to improve this page.

Rubberwala Housing & Infrastructure Interview Process

based on 7 interviews

Interview experience

3.6
  
Good
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 261 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Dilip Buildcon Interview Questions
4.0
 • 145 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all

Rubberwala Housing & Infrastructure Reviews and Ratings

based on 33 reviews

3.4/5

Rating in categories

3.1

Skill development

3.5

Work-life balance

3.4

Salary

3.1

Job security

3.2

Company culture

3.1

Promotions

3.2

Work satisfaction

Explore 33 Reviews and Ratings
Executive Accountant
8 salaries
unlock blur

₹3.8 L/yr - ₹4.9 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Site Engineer
7 salaries
unlock blur

₹4 L/yr - ₹6.8 L/yr

Senior Civil Site Engineer
4 salaries
unlock blur

₹5.6 L/yr - ₹6.7 L/yr

Site Supervisor
4 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Rubberwala Housing & Infrastructure with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview