Rubberwala Housing & Infrastructure Project Manager Interview Questions and Answers

Updated 19 Oct 2023

1 interview found

Sort by: Popular

Project Manager Interview Questions

user image Anonymous

posted on 19 Oct 2023

Interview experience
5
Excellent
Difficulty level
Hard
Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023.

3 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

HR Round (1 Question)

  • Q1. All previous company work experience share
3

Technical Round (1 Question)

  • Q1. More than 40to 60 question

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Duration
-
Result
-

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. Base practices in ASPICE
  • Q2. Scope management and schedule
Interview experience
5
Excellent
Difficulty level
-
Duration
-
Result
-

2 Interview Rounds

1

One-on-one Round (2 Questions)

  • Q1. Self introduction
  • Q2. Experience in the concern field
2

HR Round (2 Questions)

  • Q1. They will ask about your previous experience
  • Q2. Will ask about previous salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Interview experience
3
Average
Difficulty level
Moderate
Duration
2-4 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Jan 2024.

2 Interview Rounds

1

Technical Round (2 Questions)

  • Q1. Technical Questions about Subject
  • Q2. Discussion about Experience and Number of projects done in past..
2

HR Round (1 Question)

  • Q1. Discussion about salary.
Interview experience
4
Good
Difficulty level
Moderate
Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2023.

3 Interview Rounds

1

Technical Round (1 Question)

  • Q1. Previous experience and resume detailing
2

Technical Round (1 Question)

  • Q1. Roles and responsibilities
3

HR Round (1 Question)

  • Q1. Informal and casual conversations

I applied via Referral and was interviewed in Nov 2020.

1 Interview Round

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
3
Average
Difficulty level
-
Duration
-
Result
-

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. Total Qty of steel in OHT.
  • Q2. But fusion joint for pipeline
Interview experience
5
Excellent
Difficulty level
-
Duration
-
Result
Selected Selected

2 Interview Rounds

1

Technical Round (1 Question)

  • Q1. Project Monitoring, scheduling Analyze projects, budget, cash flow, coordination with contractors, Consultant and allied services, construction, resource manage...read more
2

Group Discussion Round

Already talked to you

1 Interview Round

1

Technical Round (15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index 30%, water absorption <2% , I...read more
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. ...read more
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute...read more
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Na...read more
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is ...read more
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure st...read more
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M
Interview experience
5
Excellent
Difficulty level
-
Duration
-
Result
-

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. Base practices in ASPICE
  • Q2. Scope management and schedule

Rubberwala Housing & Infrastructure Interview FAQs

How many rounds are there in Rubberwala Housing & Infrastructure Project Manager interview?
Rubberwala Housing & Infrastructure interview process usually has 3 rounds. The most common rounds in the Rubberwala Housing & Infrastructure interview process are Resume Shortlist, HR and Technical.
How to prepare for Rubberwala Housing & Infrastructure Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rubberwala Housing & Infrastructure. The most common topics and skills that interviewers at Rubberwala Housing & Infrastructure expect are Construction Management, Project Management, PM, Project Engineering and Site Execution.

Tell us how to improve this page.

People are getting interviews through

based on 1 Rubberwala Housing & Infrastructure interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Rubberwala Housing & Infrastructure Project Manager Salary
based on 4 salaries
₹9.2 L/yr - ₹15.5 L/yr
46% less than the average Project Manager Salary in India
View more details

Rubberwala Housing & Infrastructure Project Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Site Engineer
8 salaries
unlock blur

₹4 L/yr - ₹6.8 L/yr

Executive Accountant
8 salaries
unlock blur

₹3.8 L/yr - ₹4.9 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Senior Civil Site Engineer
4 salaries
unlock blur

₹5.6 L/yr - ₹6.7 L/yr

Site Supervisor
4 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Rubberwala Housing & Infrastructure with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview