Rate analysis of variation items in contract involves calculating the cost impact of changes in scope or specifications.
Rate analysis involves determining the cost of materials, labor, and equipment for the variation items.
It helps in evaluating the impact of changes on the overall project budget.
Factors like quantity, rates, and specifications are considered in the analysis.
Examples of variation items include changes ...
posted on 22 Nov 2023
I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 16 Nov 2023
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
Santiniketan institute of polytechnic
posted on 25 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
posted on 22 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.
based on 8 reviews
Rating in categories
Senior Engineer
244
salaries
| ₹4 L/yr - ₹10.9 L/yr |
Asst Store
203
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Store Executive
193
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Structural Engineer
181
salaries
| ₹2.7 L/yr - ₹6.7 L/yr |
Mechanical Engineer
175
salaries
| ₹2.2 L/yr - ₹6.3 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
PNC Infratech