Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by RSPL Group Team. If you also belong to the team, you can get access from here

RSPL Group Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

RSPL Group Mechanical Engineer Interview Questions and Answers

Updated 5 Dec 2024

RSPL Group Mechanical Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to Find Centre of a Circle?
  • Q2. What is Types of Maintenance ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updated new Maintenance Procedure.
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Portal and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Yes I am interview
  • Q2. Yes I am mechanical engineer production engineer interview
  • Q3. Mechanical engineer production engineer interview

Mechanical Engineer Interview Questions Asked at Other Companies

Q1. What we need to do if pressure valve fail in boiler
Q2. What are the basic parts of an aeroplane and there working functi ... read more
asked in Tata Steel
Q3. Percentage of carbon presence in cast iron
Q4. How we cool a pipe in a chamber without using coolent
Q5. Why petrol engines comparison ratio low when compared to a diesel ... read more

Mechanical Engineer Jobs at RSPL Group

View all

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. How much amp does a 30 kw moter takes
  • Ans. 

    The amount of amps a 30 kW motor takes depends on the voltage it is operating at.

    • The formula to calculate amps is: Amps = kW / (Volts * 1.73)

    • For example, a 30 kW motor operating at 480 volts would take approximately 36 amps

    • Higher voltage motors will draw fewer amps compared to lower voltage motors

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join ever worst management
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Electrical questions
  • Q2. Diagrams and basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Good luck
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing breakdowns and improving overall equipment efficiency

    • Involves regular maintenance, cleaning, and inspection of equipment

    • Encourages employee involvement and ownership of equipment maintenance

    • Uses tools like 5S, autonomous maintenance, and planned maintenance to achieve

  • Answered by AI
  • Q2. What is the schedule maintenance
  • Ans. 

    Scheduled maintenance is planned maintenance activities performed on a regular basis to prevent equipment failure and ensure optimal performance.

    • Scheduled maintenance involves creating a maintenance schedule based on manufacturer recommendations or industry best practices.

    • It includes tasks such as equipment inspections, lubrication, calibration, and replacement of worn parts.

    • Scheduled maintenance helps in identifying p...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing breakdowns and improving overall equipment efficiency

    • Involves regular maintenance, cleaning, and inspection of equipment

    • Encourages employee involvement and ownership of equipment maintenance

    • Uses tools like 5S, autonomous maintenance, and planned maintenance

    • Goal is to e...

  • Answered by AI
  • Q2. The full meaning of CLITE
  • Ans. 

    CLITE stands for Closed Loop Interactive Training Environment.

    • CLITE is a system used for interactive training in various fields.

    • It provides a closed loop environment for users to practice and improve their skills.

    • Examples of CLITE systems include flight simulators for pilots and virtual reality training for medical professionals.

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is the tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing breakdowns and improving overall equipment efficiency

    • Involves regular maintenance, cleaning, and inspection of equipment

    • Encourages employee involvement and ownership of equipment maintenance

    • Uses tools like 5S, autonomous maintenance, and planned maintenance to achieve

  • Answered by AI
  • Q2. The meaning of CLITE
  • Ans. 

    CLITE stands for Closed Loop Interactive Training Environment.

    • CLITE is a type of training environment used in maintenance engineering.

    • It provides interactive simulations for hands-on learning.

    • Examples of CLITE systems include virtual reality training modules for equipment maintenance.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Any company very important machine maintenance time to time schedule maintain everyday every week maintenance machine
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Engine kitne prakar ke hote Hain
  • Q2. Petrol engine aur diesel antar mein kya antar hota hai

Interview Preparation Tips

Interview preparation tips for other job seekers - Engine type
Petrol engine vs diesel engine different

I appeared for an interview before Sep 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related as per cv technical as per my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Regarding utility. Like air compressor, power generator and packaging machine or printer machine
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Aptitude Test 

The subjects of study include Physics, Chemistry, and Mathematics.

Round 2 - One-on-one 

(2 Questions)

  • Q1. What technical questions were asked during the interview?
  • Q2. What is the process of interviewing?
  • Ans. 

    The process of interviewing involves preparation, conducting the interview, evaluating candidates, and making a decision.

    • Preparation: Define job requirements, review resumes, and create interview questions.

    • Conducting the interview: Ask questions, assess candidate skills, and discuss job expectations.

    • Evaluating candidates: Compare qualifications, consider cultural fit, and gather feedback from interviewers.

    • Making a deci...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What are the different types of interviewing techniques?
  • Ans. 

    Different types of interviewing techniques include behavioral, situational, panel, group, and phone interviews.

    • Behavioral interviews focus on past experiences and how they relate to the job

    • Situational interviews present hypothetical scenarios to assess problem-solving skills

    • Panel interviews involve multiple interviewers asking questions

    • Group interviews assess how candidates interact with others

    • Phone interviews are cond

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good morning sir/ma'am,
Thank you sir/ma'am for giving me this
Opportunity.
My name is vikash Gupta and I have completed Diploma in(Electrical Engineering) from ITM POLYTECHNIC GIDA GORAKHPUR University Board of technical education Uttar Pradesh.
And completed my industrial training in 33/11 KV SUBSTATION NAATH NAGAR DEORIA.
Present time work in ITC LIMITED.

Thank you
Name- Vikash Gupta
Mob- XXXXX
Email - *****

I applied via Campus Placement

Interview Preparation Tips

Round: Resume Shortlist
Experience: It was based on CGPA and Tech projects
Tips: Ensure you have explained your tech projects well

Round: Group Discussion
Experience: A very good panel. A lot of good points were raised.
Tips: Make sure you raise your points well
Duration: 20 minutes

Round: Technical Interview
Experience: Tried to test the basics of almost everything that we have studied.

General Tips: Be confident throughout the process. That helps a lot.
Skill Tips: Brush up your courses
Skills: Engineering Knowledge
Duration: 2
College Name: IIT Madras
Motivation: The fact that the role is going to be techno-managerial. Also, the compensation.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a Senior Engineer with 10+ years of experience in software development, specializing in backend systems and cloud technologies.

    • 10+ years of experience in software development

    • Specialize in backend systems and cloud technologies

    • Strong problem-solving skills

    • Experience with large-scale projects

    • Proficient in multiple programming languages

  • Answered by AI
  • Q2. Technical background and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be genuine and tell what experience you have do not exaggerate.

RSPL Group Interview FAQs

How many rounds are there in RSPL Group Mechanical Engineer interview?
RSPL Group interview process usually has 1-2 rounds. The most common rounds in the RSPL Group interview process are Technical and Resume Shortlist.
How to prepare for RSPL Group Mechanical Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at RSPL Group. The most common topics and skills that interviewers at RSPL Group expect are Maintenance, Inventory Management, Kaizen, Mechanical Maintenance and Moss.
What are the top questions asked in RSPL Group Mechanical Engineer interview?

Some of the top questions asked at the RSPL Group Mechanical Engineer interview -

  1. How to Find Centre of a Circ...read more
  2. What is Types of Maintenance...read more
  3. Mechanical engineer production engineer interv...read more

Tell us how to improve this page.

RSPL Group Mechanical Engineer Interview Process

based on 4 interviews

Interview experience

3.8
  
Good
View more

Interview Questions from Similar Companies

ITC Interview Questions
3.9
 • 550 Interviews
Dabur Interview Questions
4.0
 • 272 Interviews
Nestle Interview Questions
3.9
 • 234 Interviews
DS Group Interview Questions
4.1
 • 149 Interviews
Patanjali Ayurved Interview Questions
3.9
 • 110 Interviews
Parle Products Interview Questions
3.9
 • 91 Interviews
View all

Fast track your campus placements

View all
RSPL Group Mechanical Engineer Salary
based on 47 salaries
₹2.5 L/yr - ₹6 L/yr
12% less than the average Mechanical Engineer Salary in India
View more details

RSPL Group Mechanical Engineer Reviews and Ratings

based on 8 reviews

3.6/5

Rating in categories

4.1

Skill development

3.3

Work-life balance

3.4

Salary

3.8

Job security

3.4

Company culture

2.4

Promotions

3.8

Work satisfaction

Explore 8 Reviews and Ratings
Mechanical Engineer

Dhar,

Raipur

+1

2-5 Yrs

₹ 1.5-5 LPA

Explore more jobs
Territory Sales Incharge
448 salaries
unlock blur

₹1.7 L/yr - ₹5.5 L/yr

Assistant Manager
326 salaries
unlock blur

₹2 L/yr - ₹11.5 L/yr

Teritory Sales Officer
252 salaries
unlock blur

₹2.1 L/yr - ₹6.5 L/yr

Executive
203 salaries
unlock blur

₹1.4 L/yr - ₹4.5 L/yr

Area Sales Manager
184 salaries
unlock blur

₹4.1 L/yr - ₹15 L/yr

Explore more salaries
Compare RSPL Group with

Hindustan Unilever

4.2
Compare

ITC

3.9
Compare

Dabur

4.0
Compare

Nestle

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview