Upload Button Icon Add office photos

Filter interviews by

Rms Construction Civil Engineer Interview Questions and Answers

Updated 6 Feb 2023

Rms Construction Civil Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General topics from core & maths.

Round 2 - Technical 

(4 Questions)

  • Q1. Techinal round containd basic knowledge of the stream.
  • Q2. Shear force explanation
  • Ans. 

    Shear force is the force that acts parallel to a surface, causing one part of the surface to slide or shear relative to an adjacent part.

    • Shear force is a result of applied loads on a structure.

    • It is responsible for causing deformation or failure in structural elements.

    • Shear force is measured in units of force, such as Newtons or pounds.

    • It is represented by a shear force diagram, which shows the variation of shear force...

  • Answered by AI
  • Q3. Bending moment explanation
  • Ans. 

    Bending moment is a measure of the internal forces in a structural element subjected to bending.

    • Bending moment is caused by an external load applied to a structural element.

    • It is a measure of the internal forces that develop within the element as a result of the applied load.

    • Bending moment can cause the element to bend or deform.

    • It is calculated by multiplying the applied load by the distance from the load to a referen...

  • Answered by AI
  • Q4. Buckling stiffeners web

Interview Preparation Tips

Interview preparation tips for other job seekers - overall good experience for a fresher candidates with learning

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. BBS ,QUANTITY TAKE OFF ,QUANTITY OF CONCRETE, lapping, and clear cover
  • Ans. Find accurate cutting length and find the total weight of rcc structure, find out all the quantity of structure, Lapping normal used 50d clear cover our for footing 50mm and beam 25mm and column for 40mm and slab 20mm
  • Answered by Jitu Behera
  • Q2. Bbs, mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to learn the skill
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. I have a experience 3+years
  • Q2. What about of Payments details
  • Q3. Please ask when & where is my interview

Interview Preparation Tips

Interview preparation tips for other job seekers - I have knowledge for Civil Site Engineer & also Billing Process
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

It is very difficult test to pass

Round 2 - Technical 

(1 Question)

  • Q1. Technical interview of concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly go through the technical subjects before attending interview

I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What are the things to check before casting a tower foundation?
  • Ans. 

    Before casting a tower foundation, several things need to be checked to ensure its stability and durability.

    • Check the soil condition and bearing capacity

    • Ensure proper reinforcement and formwork

    • Verify the dimensions and alignment of the foundation

    • Check for any obstructions or utilities in the excavation area

    • Ensure proper curing of the concrete

    • Verify compliance with local building codes and regulations

  • Answered by AI
  • Q2. How is trapezoidal foundation quantity calculated?
  • Ans. 

    Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.

    • Measure the length and depth of the foundation

    • Measure the width at both ends and find the average width

    • Multiply the average width by the length and depth to get the volume

    • Calculate the quantity by multiplying the volume with the unit weight of concrete

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers even if you are not 100% sure about that. No one is judgi9 you by that one wrong answer but your confidence do make a difference.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Bbs,find out all quantity of structure. etc
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Minimum setting time of cement
  • Ans. 

    Minimum setting time of cement is the shortest time required for cement to harden and develop strength.

    • Minimum setting time varies depending on the type of cement and environmental conditions.

    • For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.

    • Factors affecting setting time include temperature, water-cement ratio, and presence of additives.

    • Setting time can be tested using Vicat appa

  • Answered by AI
  • Q2. Instrument used in surveying
  • Ans. 

    Theodolite is an instrument used in surveying to measure horizontal and vertical angles.

    • Theodolite is used to measure angles in both horizontal and vertical planes.

    • It consists of a telescope mounted on a base with graduated circles for precise measurements.

    • Theodolite is commonly used in construction, mapping, and land surveying.

    • Other instruments used in surveying include total stations, levels, and GPS receivers.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I was interviewed before Oct 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - QC engineer 

(6 Questions)

  • Q1. Dlc . Pqc club test beam testing GSA FSI gradetion soil testing CBR Slum testing DBM BC
  • Q2. PQC DLC DBM BC SOIL TESTING
  • Q3. Cor citing pqc dlc leing
  • Q4. Site testing lab testing plant testings
  • Q5. FDD site testing. Cor citing
  • Q6. Cement testing initial testing final

Interview Preparation Tips

Interview preparation tips for other job seekers - QC engineer job to civil engineer to work DBL air port project to Rajkot

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Brick work plaster work tile work flooring work cladding work

Rms Construction Interview FAQs

How many rounds are there in Rms Construction Civil Engineer interview?
Rms Construction interview process usually has 3 rounds. The most common rounds in the Rms Construction interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in Rms Construction Civil Engineer interview?

Some of the top questions asked at the Rms Construction Civil Engineer interview -

  1. shear force explanat...read more
  2. bending moment explanat...read more
  3. Techinal round containd basic knowledge of the stre...read more

Tell us how to improve this page.

Rms Construction Civil Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Rms Construction Civil Engineer Salary
based on 6 salaries
₹2.1 L/yr - ₹4.2 L/yr
35% less than the average Civil Engineer Salary in India
View more details
Civil Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Project Engineer
5 salaries
unlock blur

₹4.5 L/yr - ₹6 L/yr

Site Engineer
5 salaries
unlock blur

₹3.6 L/yr - ₹4.2 L/yr

Electrical Site Engineer
5 salaries
unlock blur

₹4.1 L/yr - ₹5.5 L/yr

Senior Civil Engineer
4 salaries
unlock blur

₹3.4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Rms Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview