Recpdcl.ltd Civil Site Engineer Interview Questions and Answers

Updated 21 Mar 2021

Recpdcl.ltd Civil Site Engineer Interview Experiences

1 interview found

Interview Questionnaire 

4 Questions

  • Q1. Very basic Questions related to QA & Estimation
  • Q2.  Method of Estimation
  • Ans. 

    Method of estimation refers to the process of calculating the approximate cost of a project or task.

    • Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.

    • Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.

    • Estimation can be done manually or using software such as AutoCAD, Excel...

  • Answered by AI
  • Q3. Ration of concrete
  • Ans. 

    The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.

    • The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.

    • Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.

    • The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...

  • Answered by AI
  • Q4. What is Sub and super Structure
  • Ans. 

    Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.

    • Substructure includes foundation, basement, and retaining walls

    • Superstructure includes columns, beams, walls, and roof

    • Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure

    • Examples of substructure ...

  • Answered by AI

Interview questions from similar companies

I applied via Walk-in

Round 1 - HR 

(1 Question)

  • Q1. About your self and salary discussion
Round 2 - Technical 

(1 Question)

  • Q1. Plant maintainace for instrumentation related

Interview Preparation Tips

Interview preparation tips for other job seekers - Family back ground and relationship back ground
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. 33/11 kv pss working
  • Ans. 

    33/11 kv pss refers to a 33kV/11kV primary substation working.

    • 33/11 kv pss stands for a primary substation with a voltage level of 33kV/11kV.

    • It is responsible for stepping down the high voltage from the transmission line to a lower voltage suitable for distribution to consumers.

    • The substation includes equipment such as transformers, circuit breakers, and protection devices.

    • It plays a crucial role in ensuring reliable p...

  • Answered by AI
  • Q2. Ht line devlopment and planning
  • Q3. About youself and projects

I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M-25 Grade concrete and what are its ratio
  • Ans. 

    M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).

    • M-25 Grade concrete is commonly used in construction projects.

    • The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).

    • The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.

    • F...

  • Answered by AI
  • Q2. How many bricks required in 1 cum.
  • Ans. 

    The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.

    • The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.

    • Standard brick sizes are commonly used in construction.

    • For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:

    • - ...

  • Answered by AI
  • Q3. 480 bricks required

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skill

I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Questions related to the management part.
Round 3 - Technical 

(1 Question)

  • Q1. Some basic & Some intermediate questions in technical.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just make sure , If you are seeking a job related to your core profile then have some basic & Intermediate knowledge.

Recpdcl.ltd Interview FAQs

What are the top questions asked in Recpdcl.ltd Civil Site Engineer interview?

Some of the top questions asked at the Recpdcl.ltd Civil Site Engineer interview -

  1. What is Sub and super Struct...read more
  2. Method of Estimat...read more
  3. Ration of concr...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 199 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Tata Power Interview Questions
3.9
 • 156 Interviews
Sodexo Interview Questions
4.1
 • 154 Interviews
Torrent Power Interview Questions
3.8
 • 122 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
Leadec India Interview Questions
4.1
 • 63 Interviews
View all
Recpdcl.ltd Civil Site Engineer Salary
based on 4 salaries
₹3.1 L/yr - ₹4.8 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Recpdcl.ltd Civil Site Engineer Reviews and Ratings

based on 4 reviews

2.4/5

Rating in categories

2.4

Skill development

3.0

Work-Life balance

3.2

Salary & Benefits

1.6

Job Security

2.5

Company culture

1.5

Promotions/Appraisal

1.8

Work Satisfaction

Explore 4 Reviews and Ratings
Project Engineer
291 salaries
unlock blur

₹2.8 L/yr - ₹5.1 L/yr

Assistant Project Engineer
223 salaries
unlock blur

₹2.1 L/yr - ₹4.1 L/yr

Electrical Project Engineer
99 salaries
unlock blur

₹3 L/yr - ₹5.3 L/yr

Senior Project Engineer
76 salaries
unlock blur

₹4 L/yr - ₹6.5 L/yr

Electrical Site Engineer
28 salaries
unlock blur

₹2 L/yr - ₹4.1 L/yr

Explore more salaries
Compare Recpdcl.ltd with

NTPC

4.2
Compare

Tata Power

3.9
Compare

Adani Power

3.9
Compare

Power Grid Corporation of India

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview