I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 2 interview rounds.
Various tests can be done at site to ensure concrete quality.
Slump test to measure consistency
Compression test to measure strength
Air content test to measure air voids
Temperature test to ensure proper curing
Rebound hammer test to measure surface hardness
Ultrasonic test to detect internal defects
Chloride ion penetration test to measure durability
Water permeability test to measure resistance to water penetration
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
Worked as a Project Engineer at XYZ Company for 3 years.
Managed multiple projects simultaneously
Collaborated with cross-functional teams to ensure project success
Implemented cost-saving measures resulting in a 10% reduction in project expenses
I applied via Recruitment Consultant and was interviewed in Jun 2021. There was 1 interview round.
I have 10 years of work experience in mechanical engineering.
Designed and implemented mechanical systems for various projects
Performed analysis and simulations to optimize performance
Collaborated with cross-functional teams to ensure project success
Managed and supervised junior engineers
Implemented cost-saving measures in manufacturing processes
Previous site infrastructure included data centers, networking equipment, servers, and storage systems.
Data centers were located in multiple regions for redundancy.
Networking equipment included routers, switches, and firewalls.
Servers were a mix of physical and virtual machines.
Storage systems used SAN and NAS technologies.
Backup and disaster recovery plans were in place.
Monitoring tools were used to track performance
Multiple scenarios of UPS DG CHILLER FAILURES
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M-25 Grade concrete is commonly used in construction projects.
The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).
The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.
F...
The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.
The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.
Standard brick sizes are commonly used in construction.
For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:
- ...
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
Parts of pumps and motors include impeller, casing, shaft, bearings, and seals.
Impeller: Rotating component that generates the flow in a pump.
Casing: Encloses and supports the impeller and other parts of the pump.
Shaft: Transfers power from the motor to the impeller.
Bearings: Support and align the shaft within the pump.
Seals: Prevent leakage of fluid from the pump.
Parts of pumps and motors include impeller, casing, shaft, bearings, and motor housing.
Impeller: Rotating component that generates the flow within the pump.
Casing: Encloses the impeller and directs the flow of fluid through the pump.
Shaft: Transfers the rotational energy from the motor to the impeller.
Bearings: Support the shaft and reduce friction during rotation.
Motor housing: Encloses the motor and provides protecti
posted on 25 Apr 2021
based on 1 interview
Interview experience
based on 116 reviews
Rating in categories
Assistant Project Engineer
215
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Project Engineer
196
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Electrical Project Engineer
99
salaries
| ₹3 L/yr - ₹5.3 L/yr |
Senior Project Engineer
98
salaries
| ₹3.8 L/yr - ₹6.5 L/yr |
Electrical Site Engineer
28
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Sodexo
Compass Group Support Services
ISS Facility Services
BVG India