i
Leadec India
Filter interviews by
Parts of pumps and motors include impeller, casing, shaft, bearings, and seals.
Impeller: Rotating component that generates the flow in a pump.
Casing: Encloses and supports the impeller and other parts of the pump.
Shaft: Transfers power from the motor to the impeller.
Bearings: Support and align the shaft within the pump.
Seals: Prevent leakage of fluid from the pump.
Parts of pumps and motors include impeller, casing, shaft, bearings, and motor housing.
Impeller: Rotating component that generates the flow within the pump.
Casing: Encloses the impeller and directs the flow of fluid through the pump.
Shaft: Transfers the rotational energy from the motor to the impeller.
Bearings: Support the shaft and reduce friction during rotation.
Motor housing: Encloses the motor and provides protecti
Delta motor wiring connection circuit diagram involves connecting three phases in a triangular configuration.
Connect the three motor windings in a triangular configuration
Label the three phases as A, B, and C
Connect the end of one winding to the start of the next winding
Ensure proper insulation and secure connections
Use appropriate wire sizes and color codes for easy identification
Sensors are devices that detect changes in physical properties and convert them into electrical signals. They come in various types and have specific working conditions.
Types of sensors include temperature sensors, pressure sensors, proximity sensors, motion sensors, etc.
Sensors work by detecting changes in physical properties such as temperature, pressure, light, etc., and converting them into electrical signals.
Worki...
I applied via Indeed and was interviewed in Jul 2024. There was 1 interview round.
Flow meters are devices used to measure the flow rate of a fluid in a pipe or conduit.
Differential Pressure Flow Meters (Orifice, Venturi, Pitot Tube)
Velocity Flow Meters (Turbine, Electromagnetic, Ultrasonic)
Positive Displacement Flow Meters (Rotary, Oval Gear, Nutating Disk)
Mass Flow Meters (Coriolis, Thermal, Weighing)
Open Channel Flow Meters (Flume, Weir)
Calibration of control valve involves adjusting the valve to ensure it opens and closes at the correct set points.
Calibration involves adjusting the valve's position to match the desired input signal.
Use calibration tools such as pressure gauges, flow meters, and positioners to adjust the valve.
Perform calibration regularly to ensure the valve operates accurately and efficiently.
Document calibration procedures and resu...
CNC stands for Computer Numerical Control, which is a system that controls the operation of machine tools through programmed commands.
CNC machines are used in various industries such as manufacturing, aerospace, automotive, and healthcare.
Types of CNC machines include CNC milling machines, CNC lathes, CNC routers, and CNC plasma cutters.
CNC machines can be classified based on the number of axes they operate on, such as...
Leadec India interview questions for popular designations
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Currently responsible for overseeing project development activities, ensuring timelines are met and budgets are adhered to.
Leading a team of project coordinators and specialists
Developing project plans and timelines
Monitoring progress and addressing any issues that arise
Collaborating with stakeholders to ensure project goals are met
Managing project budgets and expenses
Seeking new challenges and growth opportunities in a more dynamic work environment.
Looking for new challenges and opportunities for growth
Seeking a more dynamic work environment
Want to expand my skill set and experience
Interested in taking on more responsibilities and leadership roles
Get interview-ready with Top Leadec India Interview Questions
My name is kaduba pawar I have meachanical ingineer
I applied via Walk-in and was interviewed in Dec 2023. There were 3 interview rounds.
posted on 24 Nov 2021
I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.
Salary expectations are based on industry standards, experience, and qualifications.
Salary expectations can vary based on the company, location, and level of experience.
Researching industry standards and average salaries for similar positions can help in determining a reasonable salary expectation.
Consider factors such as benefits, bonuses, and opportunities for growth when discussing salary expectations.
It is importan...
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Leadec India interview -
The duration of Leadec India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 69 interviews
Interview experience
based on 810 reviews
Rating in categories
Bharuch,
Ankleshwar
+13-8 Yrs
Not Disclosed
Junior Engineer
309
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
228
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Technician
188
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
162
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Capgemini Engineering
ALTEN
Quest Global
TCS