Method of estimation refers to the process of calculating the approximate cost of a project or task.
Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.
Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.
Estimation can be done manually or using software such as AutoCAD, Excel...
The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.
The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.
Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.
The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...
Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.
Substructure includes foundation, basement, and retaining walls
Superstructure includes columns, beams, walls, and roof
Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure
Examples of substructure ...
I applied via Walk-in
posted on 15 Aug 2023
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
33/11 kv pss refers to a 33kV/11kV primary substation working.
33/11 kv pss stands for a primary substation with a voltage level of 33kV/11kV.
It is responsible for stepping down the high voltage from the transmission line to a lower voltage suitable for distribution to consumers.
The substation includes equipment such as transformers, circuit breakers, and protection devices.
It plays a crucial role in ensuring reliable p...
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M-25 Grade concrete is commonly used in construction projects.
The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).
The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.
F...
The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.
The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.
Standard brick sizes are commonly used in construction.
For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:
- ...
I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
based on 4 reviews
Rating in categories
Project Engineer
291
salaries
| ₹2.8 L/yr - ₹5.1 L/yr |
Assistant Project Engineer
223
salaries
| ₹2.1 L/yr - ₹4.1 L/yr |
Electrical Project Engineer
99
salaries
| ₹3 L/yr - ₹5.3 L/yr |
Senior Project Engineer
76
salaries
| ₹4 L/yr - ₹6.5 L/yr |
Electrical Site Engineer
28
salaries
| ₹2 L/yr - ₹4.1 L/yr |
NTPC
Tata Power
Adani Power
Power Grid Corporation of India